DISASSEMBLY INSTRUCTIONS
B2-3
2-10: IDLER ARM 2 (Refer to Fig. 2-10-A)
Remove the Idler Arm 2.
1.
Fig. 2-10-A
Idler Arm 2
Main Chassis Ass'y
NOTE
1.
2.
In case of the Idler Gear installation, install correctly as
Fig. 2-9-B.
When installing the Middle Gear 2, check if the Middle
Gear 2 is locked correctly as Fig. 2-9-C.
Fig. 2-9-B
[OK]
[NG]
Idler Gear
Idler Gear
Idler Arm
Idler Arm
Fig. 2-9-C
Middle Gear 2
Check Lock
2-9: GEAR (Refer to Fig. 3-9-A)
Unlock the support
1
.
Remove the Middle Gear 1/2/3, Idler Gear and Feed
Gear.
1.
2.
Middle Gear 1
Middle Gear 2
Middle Gear 3
Idler Gear
Feed Gear
Fig. 2-9-A
1
Main Chassis Ass'y
2-8: RELAY PCB ASS'Y (Refer to Fig. 3-8-A)
Remove the screw
1
.
Remove the Relay PCB Ass'y.
1.
2.
Fig. 2-8-A
1
Relay PCB Ass'y
Main Chassis Ass'y
NOTE
1. When installing the wire of the Relay PCB, install it
correctly as Fig. 2-8-B.
• Screw Torque: 4
±
0.5kgf•cm
Fig. 2-7-B
Fig. 2-7-C
Should not be engaged.
Check the position of
the Rack Feed Lever.
Moving smoothly
Moving smoothly
NOTE
1.
2.
After the assembly of the Rack Feed, check if the Rack
Feed 1/2 is moving smoothly. (Refer to Fig. 2-7-B)
In case of the Rack Feed Ass'y installation, install
correctly as Fig. 2-7-C.
Fig. 2-8-B
Summary of Contents for MVD2113
Page 60: ...M5K3 15V K455003 SPEC NO O R NO...
Page 116: ...M5P2 05V K465024 SPEC NO O R NO...