Installation Manual
M-WRG-M/MB-FR75/1 / FR75/2 / FR63/1 / FR63/2
- 9 -
V E N T I L AT I O N & H E AT R E C O V E R Y
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
7
Installing the installation kit
WARNING
Follow the relevant accident prevention regulations
►
Follow the accident prevention regulations when setting up the installation location.
►
Protect the outside area against falling parts.
7.1
Fixing the fixing plate to the wall box
►
Use the Spax screws to fix the fixing plate (see Fig. 4 and Fig. 5).
Fig. 4: M-WRG-M/MB-FR75(63)/1, Fixing the
fixing plate for exhaust air
or
supply air
Fig. 5: M-WRG-M/MB-FR75(63)/2, Fixing the fixing
plates for exhaust air
and
supply air
7.2
Breaking through the wall
The wall breakthrough can either be included when planning a new build or subsequently made in
the solid wall.
7.2.1
Planning the wall breakthrough for new builds
►
Commission an architect or design professional to include the wall breakthrough at a suitable
point in the construction drawing and execute it when constructing the building shell.
There are two possible versions of the wall breakthrough:
— Wall breakthrough with recess (see Fig. 6) for installation kit
without
filler piece
M-WRG-M/Fü
— Full-width wall breakthrough (see Fig. 7) for installation kit
with
filler piece
M-WRG-M/Fü