5. Push the lever on the latching mechanism up, making sure that the latching mechanism catches 

the locking bar. The lever should now be parallel to the front panel. 

6. Check the indicator lights to make sure the switch has power.

The installer should use a rack cable to support the mechanical and environmental characteristics of 
a fully populated switch platform Chassis.

The rack mounting is designed to fit the Dell M1000e Chassis. Take precautions to 
guarantee proper ventilation for air intake at the front of the chassis and exhaust at the 
rear in order to maintain good airflow at ambient temperature. Cable routing in partic-
ular should not impede the air exhaust from the chassis.

2.2.3

Power Connections and Initial Power On

Caution: The switch platform will automatically power up when AC power is applied. There is no 
power switch. Immediately upon closing the latching mechanism check to make sure that the 
Power on to the Switch LED is lit.

2.2.4

InfiniBand Cable Installation

All cables can be inserted or removed with the unit power on. To insert a cable, press the connector 
into the port receptacle until the connector is firmly seated. The GREEN LED indicator below each 
port will light when the physical connection is established (that is, when the unit is powered on and 
a cable is plugged into the port with a functioning port plugged into the other end of the connector). 
After plugging in a cable, lock the connector using the latching mechanism particular to the cable 
vendor. The YELLOW LED will light (non blinking indicating that no data is being transferred 
yet). When a logical connection is made the yellow LED will blink signifying data is being trans-
ferred. 

To remove, disengage the locks and slowly pull the connector away from the port receptacle. Both 
LED indicators will turn off when the cable is unseated.

Care should be taken not to impede the air exhaust flow through the fan modules. 

Note: Cable lengths should be used which allow for routing horizontally around to the side of the 
chassis before bending upward or downward in the rack.

2.2.5

InfiniBand Optical Cable Installation

 

M2401G switches will work with optical cables and media adapters. Insert the media adapter into 

the connector and then connect the optical cable to the media adapter. Make sure to close any locks 
on the cables and media adapters. The GREEN LED indicator below each port will light when the 
physical connection is established (that is, when the unit is powered on and a cable is plugged into 
the port with a functioning port plugged into the other end of the connector). The YELLOW LED 
will light (non blinking indicating that no data is being transferred yet). When a logical connection 
is made the yellow LED will blink signifying data is being transferred. 

To remove, disengage the locks and slowly pull the connector away from the port receptacle. Both 
LED indicators will turn off when the cable is unseated.

Care should be taken not to impede the air exhaust flow. 

Summary of Contents for M2401G

Page 1: ...Mellanox Technologies M2401G 24 Port 20Gb s InfiniBand Switch for the Dell M1000e Chassis User Manual Rev 1 0...

Page 2: ...909 7200 Fax 972 4 959 3245 NOTE THIS INFORMATION IS PROVIDED BY MELLANOX FOR INFORMATIONAL PURPOSES ONLY AND ANY EXPRESS OR IMPLIED WARRANTIES INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF...

Page 3: ...2 2 2 Mechanical Installation 11 2 2 2 1 Removing an Old Switch From the Chassis 12 2 2 2 2 Removing a Blank Cover Plate From the Chassis 12 2 2 2 3 Installing the Mellanox M2401G Switch Into the Dell...

Page 4: ...ttp support dell com Conventions Throughout this manual the name M2401G and the term switch are used to describe the 24 port 20Gb s InfiniBand switch for the Dell M1000e unless explicitly indicated ot...

Page 5: ...User Manual MellanoxTechnologies Rev 1 0 5 This product does not require Advanced Management Table 2 Switch Products Covered in this User s Manual Product Number Description M2401G 24 Port 20 Gb s unm...

Page 6: ...Rev 1 0 MellanoxTechnologies 6 Revision History Table 3 Revision History Table Date Revision Description June 2008 Rev 1 0 First Draft...

Page 7: ...m comes pre installed with all necessary firmware and configured for standard operation with InfiniBand fabric and requires an InfiniBand compliant Subnet Manager running from one of the hosts All tha...

Page 8: ...running and a valid physical connection between nodes exists The yellow LED when lit indicates a valid data activity link this is the logical link The yellow LED illuminates when the InfiniBand netwo...

Page 9: ...te Source LED Blue Amber Green OFF N A OFF OFF OFF BOOT_IN_PROGRESS IOM OFF OFF ON NORMAL STACK_MASTER IOM ON OFF ON STACK_SLAVE Stackable IOM OFF OFF ON IOM_FAULT self diagnosed IOM OFF BLINK 1HZ ON...

Page 10: ...ty Warnings 1 Installation Instructions Read all installation instructions before connecting the equipment to the power source 2 Over temperature This equipment should not be operated in an area with...

Page 11: ...he top 7 Equipment Installation This equipment should be installed replaced or serviced only by trained and quali fied personnel 8 Equipment Disposal Disposal of this equipment should be in accordance...

Page 12: ...nk cover plate by pushing the red latch release button 3 Pull the locking arm down to a position perpendicular to the front of the chassis 4 Pull the cover plate out of the chassis using the locking a...

Page 13: ...ctioning port plugged into the other end of the connector After plugging in a cable lock the connector using the latching mechanism particular to the cable vendor The YELLOW LED will light non blinkin...

Page 14: ...available Mellanox will notify customers and the new firmware image will be found on the Mellanox firmware download page You will need the Mellanox Firmware Tools package to update firmware for this s...

Page 15: ...connector does not come on 1 Check that both ends of the cable are connected 2 Check that the locks on the ends are secured 3 Make sure that the latest FW version is installed on both the HCA and the...

Page 16: ...hock Vibration 50W M2401G 0 to 50 Celsius 10 90 non condensing Protocol Support Regulatory Compliance InfiniBand QoS Management Auto Negotiation of 10Gb s or 20Gb s 8 InfiniBand Virtual Lanes for all...

Page 17: ...M2401G 24 Port 20Gb s InfiniBand Switch for the Dell M1000e Chassis User Manual MellanoxTechnologies Rev 1 0 17 Appendix B Mechanical Drawing Figure 4 Mechanical Drawing of the Switch...

Page 18: ...commercial environment This equip ment generates uses and can radiate radio frequency energy and if not installed and used in accor dance with the instruction manual may cause harmful interference to...

Page 19: ...ments Japan Class A Statement Translation This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment VCCI If this equipment i...

Page 20: ...G6 G7 G8 G9 GND GND GND GND GND GND Sense 3 3V Vcc GND S1 S2 S3 S4 S5 S6 S7 S8 S9 S11 S12 S13 S14 S15 S16 S10 H1 H2 GND GND Table 6 Connector Pin Name and Numbe Name Correspondence Connector Pin Numb...

Page 21: ...M2401G 24 Port 20Gb s InfiniBand Switch for the Dell M1000e Chassis User Manual MellanoxTechnologies Rev 1 0 21 Appendix E Local Authorization Form...

Page 22: ...Rev 1 0 MellanoxTechnologies 22...

Reviews: