Rev 1.0
Mellanox Technologies
10
2.2
Switch Platform Installation and Operation
Installation and initialization of the switch platform are straightforward processes, requiring atten-
tion to the normal mechanical, power, and thermal precautions for rack-mounted equipment. The
switch platform does not require any programming or configuration to operate as a basic Infini-
Band switch and includes all of the necessary functionality to operate with external standard Infini-
Band Subnet Management software.
This section describes the installation process and basic operation of the switch platform. Please
first read the warnings sub-section carefully before carrying on with installation procedures.
2.2.1
Installation Safety Warnings
1.
Installation Instructions
Read all installation instructions before connecting the equipment to the power
source.
2.
Over-temperature
This equipment should not be operated in an area with an ambient temperature
exceeding the maximum recommended: 50°C (122°F). Moreover, to guarantee proper
air flow, allow at least 8cm (3 inches) of clearance around the ventilation openings.
3.
Stacking the Chassis
The chassis should not be stacked on any other equipment. If the chassis falls, it can
cause bodily injury and equipment damage.
4.
During Lightning - Electrical Hazard
During periods of lightning activity, do not work on the equipment or connect or dis-
connect cables.
5.
Copper InfiniBand Cable Connecting/Disconnecting
Copper InfiniBand cables are heavy and not flexible, as such they should be carefully
attached to or detached from the connectors. Refer to the cable manufacturer for spe-
cial warnings and instructions.