Instructions Manual
7.Confirmation of Setting and Connection
7-1.Check Points
This product requires different switch setting and motor wiring depending on
the motor used.
Check if the switch setting and the motor wiring are correctly performed.
Setting of
PULSE INPUT TYPE SELECT switch
Connection of J1
STEP SEL
(switch No.)
Setting of
MOTOR SELECT switch
MOTOR SEL
(OFF)
DHT SEL
(DH1/DH2)
MOTOR
Setting of HOLD CURRENT
SELECT switch
HOLD I.SEL
(switch No.)
Connection of J3
Connection of J2
DC+, DC-
Check
Remarks
Check Points
Setting of DRIVE CURRENT
SELECT switch
S.T SEL
(S.T1/S.T2)
DRIVE I.SEL
(switch No.)
Setting of
STEP TABLE switch
Setting of STEP ANGLE
SELECT switch
SPI SEL
(1P/2P)
Setting of HOLD SWITCHING TIME
SELECT switch
-26-
Summary of Contents for GDB-5F40
Page 31: ...Instructions Manual 10 2 I O Signal 1 Example Circuit Connection 31 ...
Page 37: ...Instructions Manual 10 3 Dimensions Unit mm 37 ...
Page 40: ...Instructions Manual 40 ...
Page 41: ...Instructions Manual 41 ...
Page 42: ...Instructions Manual 42 ...
Page 43: ...Instructions Manual 43 ...
Page 44: ...Instructions Manual 44 ...