
Operating instructions for trolley washing machine model WS 125
9648649
Design and construction subject to change without prior notice!
Page
35
of
38
Service step
Maintenance work
Cleaning /
Maintenance
work
Daily
at least once
every quarter
at least once
every six
months
but
every
1000
hrs
at least once
every year
but
every 2000
hrs
11. Rinse agent dosage
Check the function (if possible, coordinate with chemicals supplier)
12. Check the function of the total machine
Check machine for correct interaction of all functions
Dishwashing test.
Check cleaning results, drying results
Air compressors (if present)
Observe the manufacturer’s operating instructions in all cases
Check the oil level
Remove the condensation water from the boiler
13. Visual inspection of the machine environment
Foaming detergents must not be used close to the machine area and not
in connection with the machine
Water treatment system (if present)
Observe the manufacturer’s operating instructions in all cases
Reverse osmosis installation (visual check); inform customers on the
necessity of installation maintenance
Demineralisation installation (visual check); inform customers on the
necessity of installation maintenance.
Detergent circulation tank temperature according to DIN 10510 55°C to 65°C
Clean water rinse temperature according to DIN 10510 80°C to 85°C
The service steps
-
must be carried out by personnel trained for this purpose.
trained operating personnel
instructed company tradesmen
trained company tradesmen or installation engineer
installation engineer trained by MEIKO
You can document the completed maintenance work on the following pages. Meiko recommends that you enter the
half-yearly service steps (
), and the annual service steps (
).
Summary of Contents for WS 125
Page 38: ......