background image

 

 

3

 

Consultation with Megger 

The present system manual has been designed as an operating guide and for 
reference. It is meant to answer your questions and solve your problems in as 
fast and easy a way as possible. Please  start with referring to this manual 
should any trouble occur. 
In doing so, make use of the table of contents and read the relevant paragraph 
with great attention. Furthermore, check all terminals and connections of the 
instruments involved. 
Should any question remain unanswered, please contact:  
 

 

Megger Limited 

Seba Dynatronic 
Mess- und Ortungstechnik GmbH 

Archcliffe Road 
Kent CT17 9EN 
T: +44 1304 502100 
F: +44 1304 207342 
E: [email protected] 

Dr.-Herbert-Iann-Str. 6 
D - 96148 Baunach  
T: +49 9544 68 – 0 
F: +49 9544 22 73 
E: [email protected] 

 

 

Hagenuk KMT 
Kabelmesstechnik GmbH 

Megger USA 

Röderaue 41 
D - 01471 Radeburg / Dresden 
 
T: +49 35208 84 – 0 
F: +49 35208 84 249 
E: [email protected] 

Valley Forge Corporate Centre 
2621 Van Buren Avenue 
Norristown, PA 19403 USA 
T: +1 610 676 8500 
F: +1 610 676 8610 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 Megger 

All rights reserved. No part of this handbook may be copied by photographic or other means 
unless Megger have before-hand declared their consent in writing. The content of this handbook 
is subject to change without notice. Megger cannot be made liable for technical or printing 
errors or shortcomings of this handbook. Megger also disclaim all responsibility for damage 
resulting directly or indirectly from the delivery, supply, or use of this matter. 

Summary of Contents for 128311841

Page 1: ...HV Tester 25 kV 128311841 Operating Manual...

Page 2: ......

Page 3: ...304 207342 E uksales megger com Dr Herbert Iann Str 6 D 96148 Baunach T 49 9544 68 0 F 49 9544 22 73 E sales sebakmt com Hagenuk KMT Kabelmesstechnik GmbH Megger USA R deraue 41 D 01471 Radeburg Dresd...

Page 4: ...he date of delivery Each component supplied by Megger within the context of warranty will also be covered by this warranty for the remaining period of time but for 90 days at least Each measure to rem...

Page 5: ...Function 4 2 4 Specifications 5 3 PREPARATION FOR USE 7 3 1 Operating requirements 7 3 2 Power supply 7 3 2 1 Internal rechargeable battery 7 3 2 2 Mains 8 3 2 3 External battery 8 3 2 4 Maintenance p...

Page 6: ...Operating Manual II HV Tester 25 kV Table of Figures Figure 1 HV Tester 25 kV 4 Figure 2 HV Tester 25 kV 9 Figure 3 Example for connecting HV Tester 25 kV 10 Figure 4 Front of the HV Tester 25 kV 11...

Page 7: ...the work processes involved however there may be parts of the system and its peripherals which cannot be given optimum protection without an unreasonable reduction in function and usability The follo...

Page 8: ...g personal protection work safety and technical safety are indicated as follows WARNING Warning indicates work and operating procedures which must be complied with in full to exclude the possibility o...

Page 9: ...cable black 00006 HV connecting cable shielded incl clamp 00007 User manual Service pack 00008 Packing Table 1 Scope of supply 2 1 2 Use of the set The HV Tester 25 kV is used for electrical testing...

Page 10: ...e testing time Figure 1 HV Tester 25 kV 2 3 Function Before the set can be used the HV Tester 25 kV has to be grounded properly When the high voltage adjuster is set to zero and the timer works the te...

Page 11: ...arity infinitely variable Output current 1 5 mA Short circuit current 1 6 mA 0 1 mA Voltage measuring range 0 30 kV Current measuring range 0 0 2 mA and 0 2 mA Discharge energy 3000 J max Operating ti...

Page 12: ...Operating Manual 6 HV Tester 25 kV...

Page 13: ...ld it must be placed outside the cable trench and protected against dirt and moisture The HV Tester should be set up inside the cordon at a distance of approx 3 m from the high voltage preferably at o...

Page 14: ...urned off allowing recharging floating operation of the internal battery CAUTION Take care of the voltage selector switch 1 p 9 3 2 3 External battery The external DC voltage must be in the 11 15 V ra...

Page 15: ...The connecting cable is in the front of the carrying case 1 2 3 7 6 5 4 1 Voltage selector 2 Power supply 3 Fuse 1 25 A slow for 115 V and 230 V 4 Connector for external battery 5 Station ground 6 HV...

Page 16: ...ground terminal 5 of the HV Tester 25 kV 3 In the case of mains operation the ground safety circuit checks whether the protective ground protective conductor terminal 7 and station ground have the sa...

Page 17: ...for the high voltage with forced zero position 4 Unit on lamp Lights up white when the unit is switched on with the mains switch 8 5 Ground terminal lamp Lights up yellow when the HV Tester is ground...

Page 18: ...forced zero position Tip If you want to select testing times shorter than 5 min turn the rotary knob of the timer first beyond the position 5 and then to the desired time The red illuminated HV off 7...

Page 19: ...tage must be switched off by a second operator pressing the red HV off button 4 2 3 Safety measures The set must only be operated by electricians in accordance with DIN VDE 1005 It must only be operat...

Page 20: ...Operating Manual 14 HV Tester 25 kV...

Page 21: ...s lamps and tools are included in the service kit The HV Tester 25 kV is test equipment and as such must be handled and looked after with care Moisture external soiling direct sunlight and ambient tem...

Page 22: ...Operating Manual 16 HV Tester 25 kV...

Page 23: ...ie z me nor da ka iztr d jumu uz kura t atrodas nedr kst izmest kop ar parastiem m jsaimniec bas atkritumiem T k tas ir izstr d jums ko cits citam p rdod un lieto tikai uz mumi tad to nedr kst ar izme...

Reviews: