Installation - System and Accessory
16 - 105
Figure 16 - 27: Wall Mount Friction Plate - Close-up
2.
Remove the wing nut (B) from the top of the pivot bolt (A).
3.
Remove the washer and spring (C).
4.
Lift the mounting plate (D) off of the mounting pins and flip over.
5.
Install the spring and washer (C) onto the mounting pin.
6.
Install wing nut (B) on mounting bolt (A) and tighten down until it stops.
7.
Install the Display Control Unit onto the wall mount bracket.
16.6 Accessory Installation
•
"Syringe Heat Maintainer Installation"
•
"Syringe Pressure Jacket Installation"
•
"Hand Switch and Foot Switch Installation"
•
•
"Display Control Unit Sterile Sheath Installation"
•
16.6.1 Syringe Heat Maintainer Installation
Figure 16 - 28: Syringe Heat Maintainer Port (A)
NOTE:
Remove and discard cap covering the port (A).
A
B
C
D
A
Summary of Contents for Mark 7 Arterion
Page 1: ...Operation Manual READ BEFORE USING...
Page 2: ......
Page 8: ...MEDRAD Mark 7 Arterion Injection System vi...
Page 10: ...MEDRAD Mark 7 Arterion Injection System 1 2...
Page 16: ...MEDRAD Mark 7 Arterion Injection System 2 8...
Page 23: ...Symbols and Icons 3 15 This Way Up Not made with natural rubber latex...
Page 24: ...MEDRAD Mark 7 Arterion Injection System 3 16...
Page 36: ...MEDRAD Mark 7 Arterion Injection System 5 28...
Page 48: ...MEDRAD Mark 7 Arterion Injection System 8 40...
Page 58: ...MEDRAD Mark 7 Arterion Injection System 9 50...
Page 68: ...MEDRAD Mark 7 Arterion Injection System 10 60 Figure 10 5 ISI Enabled...
Page 80: ...MEDRAD Mark 7 Arterion Injection System 11 72...
Page 90: ...MEDRAD Mark 7 Arterion Injection System 14 82...
Page 146: ...MEDRAD Mark 7 Arterion Injection System 17 138...
Page 152: ...MEDRAD Mark 7 Arterion Injection System 18 144...
Page 156: ...MEDRAD Mark 7 Arterion Injection System A 148...
Page 161: ......