Bringing the device into operation
5
Deutsch
English
Nederl
ands
Franç
a
is
Itali
a
no
Esp
a
ñol
Dansk
Bringing the device into operation
Information
Please read the “
Safety information
” chapter on page 3
under all circumstances
before
bringing the device into operation.
Setup
Attach the stand of the TFT monitor as illustrated. Carry out this step before connecting the monitor.
(Ill.: Installation of the monitor stand)
Preparation of your PC
You may have to make some preparations if you have been operating a tubed monitor on your computer up to
now. This will be necessary if your current monitor has been operated with settings that are not supported by
your new TFT screen.
The screen will represent up to
1366 x 768
scanning elements. This resolution corresponds to the physical
resolution. TFT screens achieve complete image quality with the physical resolution. The display will not appear
on the whole area of the screen, under certain circumstances, if you change to a representation with deviating
settings.
Distortions can also appear in the representation, particularly in the case of lettering.
Set a resolution and image frequency on the PC supported by both monitors, using the old monitor, before you
connect the new monitor.
Shut down the PC and connect the new monitor.
You will be able to adjust the screen settings on the
E53002 (MD 20089)
as described after restarting.
Summary of Contents for Akoya E53002
Page 21: ...Deutsch 20 ...
Page 41: ...English 20 ...
Page 61: ...Nederlands 20 ...
Page 81: ...Français 20 ...
Page 101: ...Italiano 20 ...
Page 121: ...Español 20 ...
Page 141: ...Dansk 20 ...