9
Figure 4.1: Install Upper Cabinet
To Lower Cabinet (T)
Figure 4.2: Complete Unit
Installation (T)
Figure 4.3: Open The Back Door To
Lock The Hook Latches (T)
Lock hook latches
Connect the lower
harness set with the
upper harness set.
9.
10.
12.
13.
14. Lock the fiber door with key.
Connect the connectors from the lower wiring harness to the
upper wiring harness.
Connect the power cord to power input module on the back
of the cabinet.
11. Using the ground cable provided, attach the GND Terminal to
earth ground. This terminal is only to be used, when earth
connection is not provided by the power supply source.
Adjust leg levelers as needed then proceed to game setup.
Double check all of the connections before powering up the
Spectrum .
BY MEDALIST