background image

page 4

3. PREPARATION BEFORE TEST

Choose appropriate accessory and attach to gauge
a) Pull Test

Choose test hook and attach to the load application rod marked 

[PULL].

b) Push Test

Choose appropriate accessory from items supplied and attach to the load application rod 
marked 

[PUSH].

c) Use of extension rod

The extension rod can be used on either the 

[PUSH]

or 

[PULL]

application rod.

NOTE:
When using the extension rod ensure that the load is applied axially to the gauge in
order to maintain the accuracy.

a) 

[PEAK]

change to 

[TRACK]

Press button while at the same time rotating anti-clockwise until the 

[TRACK]

is reached.

b) 

[TRACK]

change to 

[PEAK]

Turn button clockwise until the 

[PEAK]

position is reached.

c) After Testing

After testing is complete return the button to the 

[PEAK]

position, this helps to extend the life of

the internal mechanism.

a) Ensure that the indicator dial is rotated to 0 for the start of the test. This can be achieved by 

turning the indicator dial clockwise or anti-clockwise depending on the initial position.

b) When using the gauge vertically ensure that the indicator dial is rotated to 0 after any 

accessories have been attached.

NOTE:
Ensure that the capacity of the gauge to be used is suitable for the application. If the
gauge is constantly taken over its designed operating range it may sustain damage and
the reading will be unreliable.

4. OPERATION OF PEAK HOLD RELEASE AND TRACKING BUTTON

5. ADJUSTMENT OF INDICATOR DIAL

Summary of Contents for AN Series

Page 1: ......

Page 2: ...nce diagram 3 Preparation before test 4 Operation of peak hold release and tracking button 4 Adjustment of indicator dial 4 Hand held testing 5 Peak hold and load tracking pointer 5 Accessories 5 Actual dimensions 6 Maintenance 7 Packaging checklist 7 ...

Page 3: ...CIFICATION Model SL 2 SL 10 SL 20 SL 50 SL 100 Range 2lb 10lb 20lb 50lb 100lb Graduation 0 01lb 0 05lb 0 1lb 0 2lb 0 5lb Accuracy 2 Stroke 10mm Work temperature 20 10ºC Carry temperature 27ºC 70ºC Relative humidity 15 80 RH ...

Page 4: ...page 3 2 REFERENCE DIAGRAM ...

Page 5: ...hange to PEAK Turn button clockwise until the PEAK position is reached c After Testing After testing is complete return the button to the PEAK position this helps to extend the life of the internal mechanism a Ensure that the indicator dial is rotated to 0 for the start of the test This can be achieved by turning the indicator dial clockwise or anti clockwise depending on the initial position b Wh...

Page 6: ...e load applied to the gauge PEAK The pointer will stop at the maximum load applied during the course the test Press the release button to return the gauge to 0 The unit is supplied with a range of standard accessories Should your application require a special fixture please contact your Mecmesin supplier who will be pleased to review your requirement 7 PEAK HOLD AND LOAD TRACKING POINTER 8 ACCESSO...

Page 7: ...page 6 9 ACTUAL DIMENSIONS Please note that if you wish to use the gauge with a Mecmesin test stand then an additional bracket will be required This will increase the dimension by 13 5mm approximately ...

Page 8: ...mounting bracket Part No 408 471 F99 c Do not apply load exceeding the rated capacity of the gauge d Do not use your gauge in a place of low or high temperature and humidity please see specification table for recommended operating environment 11 PACKAGING CHECKLIST Name Quantity Analogue Gauge 1 Extension Rod 1 Hook 1 Compression Plate 1 Cone Point 1 Inverted Chisel 1 Chisel Point 1 M3 Screws 4 Us...

Page 9: ...page 8 ...

Page 10: ...page 9 ...

Page 11: ...page 10 ...

Page 12: ... Copse Business Park Slinfold West Sussex RH13 0SZ England General Enquiries t 44 0 1403 799979 f 44 0 1403 799975 Service Calibration t 44 0 1403 799920 f 44 0 1403 799925 i www mecmesin com e info mecmesin com DISTRIBUTOR STAMP ...

Reviews: