page 4
3. PREPARATION BEFORE TEST
Choose appropriate accessory and attach to gauge
a) Pull Test
Choose test hook and attach to the load application rod marked
[PULL].
b) Push Test
Choose appropriate accessory from items supplied and attach to the load application rod
marked
[PUSH].
c) Use of extension rod
The extension rod can be used on either the
[PUSH]
or
[PULL]
application rod.
NOTE:
When using the extension rod ensure that the load is applied axially to the gauge in
order to maintain the accuracy.
a)
[PEAK]
change to
[TRACK]
Press button while at the same time rotating anti-clockwise until the
[TRACK]
is reached.
b)
[TRACK]
change to
[PEAK]
Turn button clockwise until the
[PEAK]
position is reached.
c) After Testing
After testing is complete return the button to the
[PEAK]
position, this helps to extend the life of
the internal mechanism.
a) Ensure that the indicator dial is rotated to 0 for the start of the test. This can be achieved by
turning the indicator dial clockwise or anti-clockwise depending on the initial position.
b) When using the gauge vertically ensure that the indicator dial is rotated to 0 after any
accessories have been attached.
NOTE:
Ensure that the capacity of the gauge to be used is suitable for the application. If the
gauge is constantly taken over its designed operating range it may sustain damage and
the reading will be unreliable.
4. OPERATION OF PEAK HOLD RELEASE AND TRACKING BUTTON
5. ADJUSTMENT OF INDICATOR DIAL
Summary of Contents for AN Series
Page 1: ......
Page 4: ...page 3 2 REFERENCE DIAGRAM ...
Page 9: ...page 8 ...
Page 10: ...page 9 ...
Page 11: ...page 10 ...