Secton 9 - Transport and Lftng Instructons
Lifting the Machine with a Forklift
Only qualified riggers should rig and lift the machine.
Only qualified forklift operators should lift the machine with a forklift.
Be sure the crane capacity, loading surfaces and straps or lines are
sufficient to withstand the machine weight. See the serial plate for the
machine weight.
Be sure the controls and component trays are secure. Remove all loose
items on the machine.
•
•
•
ART_5803B
Fully lower the platform. The platform must remain lowered during all loading and transport
procedures.
Position the forklift forks in position as the figure above.
Drive forward to the full extent of the forks.
Raise the machine 6 in (15 cm) and then tilt the forks back slightly to keep the machine secure.
Be sure the machine is level when lowering the forks.
Lifting Instructions
Fully lower the mast and jib boom. Remove all loose items on the machine.
Attach the rigging only to the designated lifting points on the machine. There
are two lifting points on the top of the mast.
Adjust the rigging to prevent damage to the machine and to keep the machine
level.