Page 22
Mcro 26 - Operator’s Manual
March 2019
Secton 8 - Mantenance
ART_5147
Maintenance Locks
Stowed
Stowed
Keep clear of the scissor linkage when lowering.
If a Maintenance Lock requires adjustment to stow it correctly, stop the
lowering function. Adjust the maintenance lock while stationary, then return to
the lowering function.
How to Fold Down the Guardrails
ART_5034
The platform railing system consists of three fold down rail sections for the deck
extension and three sections for the main deck. All sections are held in place by
spring pins.
Each spring pin is secured to a guardrail with a cable lanyard to prevent loss. If
the lanyard is broken or not present, replace the spring pin in the hole it came out
of to prevent loss.
Fully lower the platform and retract the platform extension.
Remove the platform controls.
From inside the platform, remove the two spring pins from the front of the
deck extension.
Fold down the front rail of the deck extension. Keep hands clear of pinch
points.
Fold down the right rail of the deck extension. Keep hands clear of pinch
points.
Fold down the left rail of the deck extension. Keep hands clear of pinch
points.
Carefully open the gate and move to the rear step.
From the rear step, release the spring clip from the retaining pins from the
main deck guardrails.
Release the R.H retaining pin to fold down the right rail assembly. Keep
hands clear of pinch points.
Release the L.H retaining pin
To fold down the left rail assembly. Keep hands clear of pinch points.
Pull and rotate 90° the two pull-knobs to fold down the entry gate top rail.
Keep hands free of pinch points.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
To return the machine to normal operation mode:
Lift all rails into their upright position, then secure them with spring pins.
Check that the Personnel Entry closure functions properly.
Position the platform control box on the front right rail of the platform.
DO
NOT
use the machine until all closures and guard rails are in position and properly secured.
•
•
•