
Page 77
65-J Desel - Servce & Parts Manual
February 2021
Secton 18 - Mechancal Components
Place a 4x4 inch (10x10 cm) block between the Tension
Link and the upper portion of the turntable weldment.
Rig a sling from the Upright Post to an overhead hoist
through the tear-drop shaped hole as shown. Apply slight
lifting pressure.
Remove the pin connecting the Tension Link to the Upright
Post.
Remove the pin connecting the Lower Boom to the Upright
Post.
Remove the Upright Post.
17.
18.
19.
20.
21.
ART_4937
Upright Post
Block
Pin
Place a 2x4 inch (5x10 cm) block between the Tension Link
and the lower portion of the turntable weldment (A) and in
position to support the Lower Boom Cylinder, then remove
the 4x4 inch (10x10 cm) block placed earlier and carefully
rotate the Tension Link down.
Place a 4x4 inch (10x10 cm) block between the Tension
Link and the Lower Boom (B)
Remove the pin from the rod end of the Lower Lift Cylinder.
22.
23.
24.
ART_4938
Block
Pin
B
A
Rig slings from the Lower Boom to an overhead hoist as
shown. Apply slight lifting pressure.
Remove the pin connecting the Lower Boom to the
turntable.
Remove the Lower Boom.
Similarly rig and remove the Tension Link.
25.
26.
27.
28.
ART_4939
Lower Boom
Tension Link
Block
Pin