Secton 9 - Transportng and Lftng Instructons
Loading Two Machines
Two machines may be loaded onto a single trailer by rotating the turntable of each machine and
rotating the platforms as shown below.
8'-6"
44'-0"
ART_4748
Extend the boom of each machine approximately 15 inches (38 cm).
Arrange the machines as shown. The distance between the ends of the counterweights should be
44ft-45ft (13.4m-13.7m).
Secure the chassis of each machine as previously instructed on page 16.
Engage the Rotation Lock of each machine as previously instructed on page 16, using one of the side
turntable locking holes.
Secure the platform of each machine as previously instructed above.