Altering Straingage input to the voltage input
Opening the device
1.Remove both screw covers from the input side and remove the fastening screws from the
front cover.
2.The two hexagonal bolts on the 37-pin D-Sub port must be loosened using a socket
spanner (5 mm).
3.The printed circuit board is pulled out on the side of the 25-pin D-Sub port.
ME-Meßsysteme GmbH
Neuendorfstr. 18a
Tel.: +49 3302 89824 60
Mail: [email protected]
14
16761 Hennigsdorf
Fax: +49 3302 89824 69
Web: www.me-systeme.de
Summary of Contents for GSV-4
Page 2: ......