![MDS LEDR 1400F Installation & Operation Manual Download Page 33](http://html1.mh-extra.com/html/mds/ledr-1400f/ledr-1400f_installation-and-operation-manual_1757407033.webp)
MDS 05-3627A01, Rev. D
LEDR Series I/O Guide
25
Figure 14. EIA-530 Clocking Arrangements for
Protected (1+1) LEDR Radio Operation
4.0
INITIAL STARTUP AND
CONFIGURATION
4.1 Introduction
The radio is commonly configured to parameters provided by the cus-
tomer at the time the order was placed. Even so, there are some param-
eters that must be reviewed and set during installation. The following
steps summarize the initial set-up of a LEDR radio link. If this is your
first installation of a LEDR radio system, it is recommended the equip-
ment be set up on a test bench.
4.2 STEP 1—Power up the LEDR Radios
There is no primary power switch; simply connecting primary power to
the unit will start the radio operating. After a short self-test, a “default
screen” similar to the following appears on the radio’s LCD display:
NOTE:
The LEDR radio is normally keyed continuously, and the radio
will transmit whenever power is applied. Ensure there is a suit-
able load on the antenna connector before connecting power.
Over-the-Air RF Path
CPE
Customer Premises
Equipment (CPE)
LEDR Radio
Clock Source
CPE
Internal Clock
External Clock
Looped Clock
External Clock
External Clock
Internal Clock
Looped Clock
External Clock
Customer Premises
Equipment (CPE)
SITE A
SITE B
LEDR Radio
Clock Source
LLLLEEEEDDDDRRRR LLLLiiiinnnnkkkk
RRRRSSSSSSSSIIII:::: ----66660000 ddddBBBBmmmm