![MCZ stub Installation And User Manual Download Page 34](http://html1.mh-extra.com/html/mcz/stub/stub_installation-and-user-manual_1756393034.webp)
A
F
D
D
E
E
32
8-STUB OVERNIGHT COATING ASSEMBLY
STUB OVERNIGHT VERSION WITH REAR OR TOP SMOKE OUTLET.
Central panel assembly.
First of all take the two side profiles and fix them to the stove structure via the screws supplied (four screws on the right and five on the
left) FIG.1. Position the ceramic panel “A” on a flat surface, make sure you place a soft cloth underneath it to avoid scratching the ceramic
surface. Place the iron frame “E” on top of the ceramic panel and with a slight pressure secure it from the top via the four screws “D”
supplied with the ceramic panel “A”(FIG.2).
Once the ceramic has been assembled with the support, carefully make the air adjustment knob pass through the hole on the panel and
then bring the ceramic panel closer to the structure (FIG.3). At this point, via the two screws on the right “
H
” and the two screws “
H
” on
the left, block the panel to the side profile, and then to the stove structure FIG.4. For the upper central panel carry out the same procedure
(frame “
F
”/ceramic “
B
” assembly and fixing to the stove profile with two screws on the right “
H
” and two screws on the left “
H
”).
IMPORTANT:
When one places the lower central panel near the structure one must centre the knob with the hole in the panel.
FIG.1 SIDE PROFILES ASSEMBLY
FIG.2 CERAMIC PANEL AND METAL SUP-
PORT ASSEMBLY