![MCZ stub Installation And User Manual Download Page 22](http://html1.mh-extra.com/html/mcz/stub/stub_installation-and-user-manual_1756393022.webp)
A
B
20
4-INSTALLATION AND ASSEMBLY
IMPORTANT!
The product must be installed and connected to the product by a qualified technician or competent personnel in
order for all local or national regulations to be complied with and in any case in accordance with UNI 10683.
When the product and the relative frame are unpacked, verify that every part is in perfect working order and no damage has been caused
during transport. If the product is installed in a place that is difficult to access, the weight can be reduced by removing the internal
elements of the firebox. It is recommended to reposition each element correctly.
PREPARATION AND UNPACKING
The product is supplied on pallets with various packaging.
•
One contains the structure of Fig. 1.
•
A pallet containing the refractory parts, a cardboard box with the sides, a box with the ceramics and a box with the top Fig.2/3.
Open the package and remove the boxes. Once the package is open, remove the two brackets that block the product to the pallet (Fig.4).
Remove the two
screws A
and the other three
screws B
that block the bracket to the pallet and set the product in the pre-selected place,
making sure this complies with the requirements.
FIG. 1 - STUB STRUCTURE PACKAGE
FIG. 2 – PACKAGE CONTAINING REFRACTORY
PARTS AND BOX WITH SIDES, CERAMICS
AND TOP (STUB OVERNIGHT)
FIG. 4 - REMOVING THE PACKAGE SCREWS
FIG. 3 – PACKAGE CONTAINING REFRACTORY
PARTS AND BOX WITH SIDES, CERAMICS
AND TOP (STUB)