D
D
A
E
C
C
28
7-STUB COATING ASSEMBLY
COATING ASSEMBLY
Installation of the ceramic side panels does not present any particolar difficulties. The main warning is to install the side panels only when
the product has been placed in the chosen premises. Moving the product with the sides assembled might damage the flooring.
STUB VERSION WITH REAR OR UPPER AIR OUTLET
Central panel assembly.
First of all take the two side profiles “
D
” and fix them to the stove structure via the screws supplied “
H
” (four screws on the right and five
on the left) FIG.1. Position the ceramic panel “A” on a flat surface, make sure you place a soft cloth underneath it to avoid scratching the
ceramic surface. Place the iron frame “E” on top of the ceramic panel and with a slight pressure secure it from the top via the four screws
“C” supplied with the ceramic panel “A” (FIG.2).
Once the ceramic has been assembled with the support, carefully make the air adjustment knob pass through the hole on the panel and
then bring the ceramic panel closer to the structure (FIG.3). At this point, via the two screws on the right “
H
” and the two screws on the
left “
H
”, block the panel to the side profile, and then to the stove structure (FIG.4).
IMPORTANT:
When one places the central panel near the structure one must centre the knob with the hole in the panel.
FIG.1 SIDE PROFILES ASSEMBLY
FIG.2 CERAMIC PANEL AND METAL SUP-
PORT ASSEMBLY