Fusing the Pipe
After the heating cycle is completed, remove the heater and quickly
apply fusion force with the lever handle in accordance with the pipe
manufacturer's recommended fusion procedure or appropriate joining
standard. A torque wrench can be used when a specified Interfacial
Pressure is required.
NOTICE:
Failure to follow pipe manufacturer's heating time, pressure
and cooling time may result in a bad joint.
TX04766-12-08-14
Heating the Pipe
With heater in position between the pipe ends, snap pipe ends sharply
against the heater to ensure alignment. Follow the pipe manufacturer's
recommendations for heating time and pressure.
TX01040-7-18-96
Butt Fusion Procedure
PH02
41
2-1
2-3-02
3 - 4
PH03
12
3-1
2-6-05
Summary of Contents for 2CU
Page 1: ...Manual 201001 Revision F 09 20 2CU Fusion Machine Operator s Manual Original Language English...
Page 32: ......
Page 34: ......