Central heating stove - MBS Thermo Pellet
OPERATION
-
During first operation, there is combustion of protective agents which used to
be there during manufacture and storage of stove elements, and evaporation
of color by which stove parts are protected against corrosion. Thus, please
ventilate the room in terms of removal of undesired scents.
-
During first operation, we recommend presence of expert within 30 min, thus
he can assure observance of all requirements for proper and safe operation of
the stove.
-
Check if stove is properly connected to the electric current, with chimney, on
safe distance of inflammable materials, supplied with quality pellet and provide
stove with supply of fresh air for combustion. On the back side of stove in
lower left part, there is switch with marks 0 and 1 (fig. 2. pos. 16). When you
confirm observance of all prerequisites for operation of the stove, turn on
electric power by turning the switch into position 1, and follow further
instructions ion ther part "Handling".
Cleaning and maitenance:
During cleaning, turn off the stove form the main power;
Clean the stove exclusively when cold;
Glass on the stove is to be cleaned with wet mop. If necessary, use water
and soft detergents, but only when glass is cold. Abrasive agents will
damage glass so do not use them. Pay attention to, after cleaning of glass
surfaces, remove humidity and prior to operation provide it dry;
Colored and enameled parts are not to be cleaned with abrasive agents
since it will remove protective cover. Use solution of water and detergent.
Take wet mop or sponge and slightly clean unclean parts, rinse them with
water after washing and dry surfaces which are covered with color or
enameled electrostatically. Do not allow water to penetrate to electric parts
of the stove;
Regularly, after usage, when stove and ash got cold, clean ash from the
firebox. Use vacuum devices for cleaning of firebox;
Regularly empty ashtray, only when stove is turned off;
Pay attention that vessel for combustion of pellets is always clean, and
openings for draft are always passable.
Once a month, clean area behind ashtray by removing the closure (fig.2a).
Closure is to be removed by unscrewing 4 screws. Use vacuum cleaner to
clean chamber. Prior to operation, return closure to its place and secure it.
It is also necessary to remove closure of smoke gases (fig. 2b) which is
located below majolica (ceramic plate) and which is secured wth two
locknuts, and use handle to elevate and low lower
6