BODY STRUCTURE [PANEL REPLACEMENT]
09-80B–5
09-80B
TIEDOWN REINFORCEMENT INSTALLATION[PANEL REPLACEMENT]
id098008800300
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit properly.
End Of Sie
BM: SHROUD PANEL
3
1
TIEDOWN REINFORCEMENT
3
1
TIEDOWN REINFORCEMENT
acxuub00000075
3419-1U-06C(09-80B).fm 5 ページ 2006年3月24日 金曜日 午後4時47分