18
4. Electrical Connections
A wiring diagram is located inside the control box for connection data.
If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/pigtail
(wire size
must conform
to rating of dryer), or the dryer can be hard wired directly to the service breaker
panel. In both cases, a strain relief
must be
installed where the wiring enters the dryer.
IMPORTANT:
A separate protected circuit
must be
provided to each dryer.
Single-Phase (1ø) Wiring Connections/Hookup
The electrical input connections on
ALL
single-phase (1ø) gas dryers are made into the rear service box
located at the upper left area of the dryer.
A ground lug is provided in the rear electrical box to connect your service ground.
FOR 110V APPLICATIONS
Single-Phase Electrical Lead Connections
Black
+
Positive
White or Red
+
Neutral
or L2
Green
+
Ground