Maytag CWG3100AAS - 24

3

INSTALLATION REQUIREMENTS

Tools and Parts

Gather the required tools and parts before starting installation. 

Read and follow the instructions provided with any tools listed 

here.

Tools needed

Parts needed

Check local codes and consult gas supplier. Check existing gas 

supply and electrical supply. See “Electrical Requirements” and 

“Gas Supply Requirements” sections.

Location Requirements

IMPORTANT:

 Observe all governing codes and ordinances. Do 

not obstruct flow of combustion and ventilation air.

It is the installer’s responsibility to comply with installation 

clearances specified on the model/serial rating plate. The 

model/serial rating plate is located at bottom front face 

surface on the right-hand side of the oven frame.

The oven should be located for convenient use in the kitchen.

Recessed installation area must provide complete enclosure 

around the recessed portion of the oven. 

All openings in the wall or floor where oven is to be installed 

must be sealed.

Cabinet opening dimensions that are shown must be used. 

Given dimensions provide minimum clearance with oven.

Grounded electrical supply is required. See “Electrical 

Requirements” section.

Proper gas supply connection must be available. See “Gas 

Supply Requirements” section.

IMPORTANT

: To avoid damage to your cabinets, check with your 

builder or cabinet supplier to make sure that the materials used 

will not discolor, delaminate or sustain other damage. This oven 

has been designed in accordance with the requirements of UL 

and CSA International and complies with the maximum allowable 

wood cabinet temperatures of 194°F (90°C).

Product Dimensions - Single Oven

Cabinet Dimensions - Single Oven

Single Oven Installed in Cabinet

NOTE: 

For gas supply pipe, provide a 3" x 3" (7.6 cm x 7.6 cm) 

opening in the back wall of the cabinet centered 7" (17.8 cm) 

from the left rear corner and 3" above the bottom of the cabinet 

cutout. Install a 120 volt electrical outlet in the back wall of the 

cabinet centered 6" (15.2 cm) from the right rear corner and 4" 

(10.2 cm) below the top of the cabinet cutout.

Tape measure

Phillips screwdriver

Flat-blade screwdriver

¹⁄₈

" Flat-blade screwdriver

Level

Hand or electric drill

Wrench or pliers

Pipe wrench

¹⁵⁄₁₆

" combination wrench

¹⁄₈

" (3.2 mm) drill bit 

(for wood floors)

Marker or pencil

Pipe-joint compound 

resistant to LP gas

³⁄₁₆

" (4.8 mm) carbide-tipped 

masonry drill bit (for 

concrete/ceramic floors)

Noncorrosive leak-detection 

solution

For LP/Natural Gas 
Conversions

½" combination wrench

mm nut driver 

Masking tape

A. 22

¹⁄₄

" (56.8 cm) max. recessed width

B. 39

¹⁄₄

" (99.7 cm) max. overall height

C. 23

⁷⁄₈

" (60.6 cm) overall width

D. 22

⁵⁄₈

" (57.5 cm) max. recessed depth

E. 37

³⁄₄

" (95.9 cm) recessed height

A.

24

" (61 cm) min. cabinet width

B. 1

¹⁄₂

" (3.8 cm) top of cutout to bottom of upper cabinet 

door

C. 14" (35.6 cm) min. bottom of cutout to floor
D. 22

³⁄₈

" (56.8 cm) cutout width

E. 1

¹⁄₂

" (3.8 cm) min. bottom of cutout to top of cabinet door

F. 38" (96.5 cm) cutout height

A

B

C

D

E

A

B

C

D

E

F

Summary of Contents for CWG3100AAS - 24"Gas Single Oven

Page 1: ...e W10526072B You can be killed or seriously injured if you don t immediately You can be killed or seriously injured if you don t follow All safety messages will tell you what the potential hazard is t...

Page 2: ...er WARNING Gas leaks cannot always be detected by smell Gas suppliers recommend that you use a gas detector approved by UL or CSA For more information contact your gas supplier If a gas leak is detect...

Page 3: ...materials used will not discolor delaminate or sustain other damage This oven has been designed in accordance with the requirements of UL and CSA International and complies with the maximum allowable...

Page 4: ...ctrical installer determine that the ground path is adequate A copy of the above code standards can be obtained from National Fire Protection Association 1 Batterymarch Park Quincy MA 02169 7471 CSA I...

Page 5: ...ient gas supply Pipe joint compounds that resist the action of LP gas must be used Do not use TEFLON tape With LP gas piping or tubing size can be 1 3 cm minimum Usually LP gas suppliers determine the...

Page 6: ...installation 2 To avoid floor damage set the oven onto cardboard prior to installation Do not use handle or any portion of the front frame or trim for lifting 3 Remove the shipping materials and tape...

Page 7: ...inst seal area of oven front frame when pushing oven into cabinet Do not push against outside edges 2 Push oven completely into cabinet and center oven into cabinet cutout A Gas pressure regulator B U...

Page 8: ...s no adjustment When the oven control is turned on a glow bar igniter heats and ignites the gas Check Operation of Oven s 1 Turn power on The time should flash in the display 2 Check that the oven doo...

Page 9: ...valve closed position C Gas supply line WARNING Explosion Hazard Use a new CSA International approved gas supply line Install a shut off valve Securely tighten all gas connections If connected to LP...

Page 10: ...te conversion has occurred 3 Adjust burner air shutter to the widest opening that will not cause the flame to lift or blow off the burner when cold NaturalGasConversion 1 Turn manual shutoff valve to...

Page 11: ...from inside the broiler cavity 2 Screw the burner orifice hood away from the pins There will be approximately 1 to 2 turns NOTE On units using Eaton Oven Safety Valve screw the burner orifice hood awa...

Page 12: ...12...

Page 13: ...13...

Page 14: ...14...

Page 15: ...15...

Page 16: ...W10526072B 2015 All rights reserved 8 15...

Reviews: