![Mayline 50/50 Split Top Ranger Table 7774 Assembly Instructions Manual Download Page 8](http://html1.mh-extra.com/html/mayline/50-50-split-top-ranger-table-7774/50-50-split-top-ranger-table-7774_assembly-instructions-manual_1747324008.webp)
For tables
without
Optional Drawers -
continue assembly on page 13 with Tilt
Top and Reference Top assembly
NOTE:
This hole
toward rear
M
G
L
H
L
H
L
H
C
4
5
2
3
GLIDE
X453
4
C
G
8
PTHMS
#10-24 x 3/8"
X147
8
KEPS NUT
#10-24
T2
M
H
14
PRHMS
#1/4-28 x 3/8"
X156
KEPS NUT
1/4-28
T25
14
L
NOTE:
Inside screw/nut
location Rear Rail to
Rear Legs
NOTE: For ease of assembly, assemble Base 'UPSIDE DOWN'.
2. Place the two End Assemblies (1 & 2) upside down with the side panel hole toward the rear. Position the
Front Rail (5) with notches 'UP'. Position the Rear Rail (3) with the attachment holes 'DOWN'. Position 'H'
frame assembly (Step 1) with drawer cover panel 'UP' and 7/8" channel notch toward 'FRONT'.
3. Secure the 'H' Frame/Support Assembly from step 1 to the Front and Rear Rails (3&5) using #10-24 x
3/8 Screw (G) and KEPS Nuts (M). DO NOT tighten screws at this time.
4. Secure the Front Rail (5) to the End Assemblies (1&2) with two Screws (H) and two Nuts (L) per end.
Secure the Rear Rail (3) to the End Assemblies (1&2) with three Screws (H) and three Nuts (L) per end.
Note inside Screw & Nut location for rear legs. DO NOT tighten screws at this time.
5. Position the Foot Rail (4) with flat surface 'DOWN'. Attach the Foot Rail (4) to the End Assemblies (1&2)
with four Screws (H) and Nuts (L).
6. TIGHTEN ALL rail attaching screws now.
7. Install Glides (C) into the End Assemblies.
8. Turn assembled table to an upright position.
MAYLINE recommends that two people perform this task.
50/50 Split Top Ranger Table
8
L
H
L
H
Rail
Notches
Cover
Panel
1