1
1
9
2
1
S
la
u
so
n
A
v
e.
S
an
ta
F
e
S
p
ri
n
g
s,
C
A
.
9
0
6
7
0
(8
0
0
)
2
2
7
-4
1
1
6
F
A
X
(
8
8
8
)
7
7
1
-7
7
1
3
30
TROUBLESHOOTING
PLATFORM RAISES PARTIALLY THEN STOPS
1.
Lower the open platform to the
ground. Do the
CHECKING
HYDRAULIC FLUID
procedure
in this manual, If necessary,
add hydraulic fl uid.
2.
Use voltmeter to verify the
battery voltage is 12.6 volts or
more under load from pump
motor.
3.
Check for structural damage
and poor lubrication. Replace
worn parts.
4.
Check for dirty raising relief
valve
(FIG. 30-1)
. Clean or re-
place relief valve, if necessary.
ADJUSTMENT
COVER
RELIEF
VALVE
RESERVOIR
CHECKING THE RAISING RELIEF VALVE
FIG. 30-1
Keep dirt, water and other contaminants
from entering the hydraulic system. Before
opening the hydraulic fl uid reservoir fi ller
cap, drain plug and hydraulic lines, clean
up contaminants that can get in the open-
ings. Also, protect the openings from acci-
dental contamination during maintenance.
CAUTION
Summary of Contents for RA-35
Page 1: ...M 13 03 REV C MAY 2016 MAXON Lift Corp 2016 MAINTENANCE MANUAL RA 35 RA 45 ...
Page 2: ......
Page 36: ......