14 MULTIMAX USER GUIDE
Chapter 2.
Installation
2.1
LED Indicators
Name Color
Function
RUN
Green
Indicating the system status.
Blinking: Router is ready.
On: Router is starting.
Off: Router is power of.
PPP
Green
Indicating the PPP connection status.
On: PPP connection is established.
Off: PPP connection is failed.
USR
Green
Indicating the VPN status.
On: VPN tunnel is established.
Off: No VPN tunnel.
RSSI
Green Signal level: 21-31 (Perfect signal level)
Yellow Signal level: 11-20 (Normal signal level)
Red
Signal level: 1-10 (Bad signal level)
NET
Green Working under 4G network.
Yellow Working under 3G network.
Red
Working under 2G network.
SIM
Green 2 SIM cards inserted.
Yellow Only SIM 2 inserted.
Red
Only SIM 1 inserted.
Summary of Contents for MULTIMAX MA 2040
Page 1: ...Dual Port Dual SIM Industrial Cellular Router User Guide V1 01...
Page 44: ...MULTIMAX USER GUIDE 43...
Page 88: ...MULTIMAX USER GUIDE 87 The modification will take effect after Apply Save Reboot...
Page 90: ...MULTIMAX USER GUIDE 89 The modifications will take effect after click Apply Save Reboot...