1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
36
1.
Liftgate and additional
Battery Box are typically
installed on trailers as
shown in
FIG. 36-1
and
on trucks as shown in
FIG. 36-2
. See the follow-
ing page for battery and
cable connections.
LIFTGATE
ADDITIONAL BATTERY BOX -
TYPICAL LOCATION
PUMP BOX
(LIFTGATE POWER UNIT)
RECOMMENDED LIFTGATE & BATTERY BOX
INSTALLATION ON TRAILER
FIG. 36-1
TRAILER-MOUNTED
CIRCUIT BREAKER -
SECONDARY LOCATION
CIRCUIT
BREAKER
POWER CABLE
(200 AMP IN-LINE
FUSE SHOWN)
CHARGE LINE
RECOMMENDED LIFTGATE POWER CONFIGURATION
OPTIONS
TRACTOR BATTERY
CIRCUIT BREAKER -
PRIMARY LOCATION
LIFTGATE
ADDITIONAL BATTERY BOX -
TYPICAL LOCATION
PUMP BOX
(LIFTGATE POWER UNIT)
RECOMMENDED LIFTGATE & BATTERY BOX
INSTALLATION ON TRAILER
FIG. 36-2
CIRCUIT
BREAKER
POWER CABLE
(200 AMP IN-LINE
FUSE SHOWN)
CHARGE LINE
TRUCK BATTERY
CIRCUIT BREAKER -
PRIMARY LOCATION
TRACTOR BATTERIES -
TYPICAL LOCATION
TRUCK BATTERIES -
TYPICAL LOCATION
Summary of Contents for GPT Series
Page 1: ...M 99 49 REV K OCTOBER 2005 MAXON Lift Corp 2005 ...
Page 38: ......