1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
22
E
T
A
G
T
F
I
L
"
L
"
3
-
/
5
2
-
T
P
G
"
6
1
5
-
/
4
-
T
P
G
"
3
1
TABLE 22-1
OPENER
“L”
(TABLE 2)
MAIN
FRAME
POSITIONING OPENER
FIG. 22-1
4.
Position the Opener on Main Frame as
shown in
FIG. 22-1 and TABLE 21-1
.
NOTE:
Platform Opener may only be installed on Right Hand side of Main Frame
(see the illustrations on this page).
STEP 9 - WELD PLATFORM OPENER TO LIFTGATE
- Continued
CENTERING OPENER ON PLATE
FIG. 22-2B
5.
Fold the Platform against Opener
(FIG. 22-2A)
. Make sure Opener is
entered on Protective Plate as shown in
FIG. 22-2B
. Reposition the
Opener if necessary. Clamp Opener to Main Frame.
OPENER
MAIN
FRAME
PLATFORM
OPENER
PROTECTIVE
PLATE
FIG. 22-2A
Summary of Contents for GPT Series
Page 1: ...M 99 49 REV K OCTOBER 2005 MAXON Lift Corp 2005 ...
Page 38: ......