background image

Installation Steps

Figuer1-4

1

2

3

Ceiling

expanded colloidal particles

Electric drill

Borehole site

Ceiling

Mounting board

ceiling

Outer tube

Cables

Axial screws

adjusting

 

1

2

Hoisting

1

2

Step1: Take out the mounting board and
tube, then screw out 3 bolts on the tube

mounting board (be aware of direction)

Align the hole position of tube and

and screws the boits in the hole. Refer 

gure 1-4

Figuer1-6

Figuer1-7

Figuer1-5

Step2:Take out the mounting feet refer 

gure 1-5

Separate component 

① and 

 among the guide

chute. Refer 

gure 1-6.

Figure 1-4

 

part. Then screw the bolts. 

Step 3: Align the hole of component 

② and 

Refer 

gure1-7

Figuer1-8

Figuer1-9

Step 4-1: Align the assembly 

① with the assembly in Figur1-4

 and screw in the screw. Refer 

gure 1-8

 Step4

-

2: Determine the mounting position in the ceiling, then stick

 Refer 

gure 1-9.(Suitable for ceiling hoisting and installation)

 expanded colloidal particles, mount the mounting board in the ceiling.

 stickers on the drill holes, use drilling tool drill 4

Φ

10holes, insert

handle

Figuer1-11

Figuer1-10

adjusting handle

adjust tilt inner hexagon screws

adjust screws (2 sides)

adjust screws (horizontal, left,right)

(2 sides)

 Step4

-

3: Thread the cable of projector in the inner tube

 insert the inner tube into the outer tube that mount it in

 Refer 

gure 1 - 1 0.(Suitable for ceiling hoisting and installation)

 guide chute and lock 4 adjusting screws on left&right

 installing projector) hang it on the axial screws among the

 the ceiling, lift the mounting feet with 2 hands (

nish

 use allen key looses bolts on 2 sides, rotate the part of mounting feet and tighten

 then adjust the height and tighten the screw, projector tilt angle adjustment:

 1-2 bolts in case angle tilt, tighten other bolts after con

rming angle. Refer 

gure 1-11

 Step4

-

4: Adjust projector:Height adjustment:loose screw of adjusting handle

Reviews: