Installation Steps
Figuer1-4
1
2
3
Ceiling
expanded colloidal particles
Electric drill
Borehole site
Ceiling
Mounting board
ceiling
Outer tube
Cables
Axial screws
adjusting
1
2
Hoisting
1
2
Step1: Take out the mounting board and
tube, then screw out 3 bolts on the tube
mounting board (be aware of direction)
Align the hole position of tube and
and screws the boits in the hole. Refer
fi
gure 1-4
Figuer1-6
Figuer1-7
Figuer1-5
Step2:Take out the mounting feet refer
fi
gure 1-5
Separate component
① and
②
among the guide
chute. Refer
fi
gure 1-6.
Figure 1-4
part. Then screw the bolts.
Step 3: Align the hole of component
② and
Refer
fi
gure1-7
Figuer1-8
Figuer1-9
Step 4-1: Align the assembly
① with the assembly in Figur1-4
and screw in the screw. Refer
fi
gure 1-8
Step4
-
2: Determine the mounting position in the ceiling, then stick
Refer
fi
gure 1-9.(Suitable for ceiling hoisting and installation)
expanded colloidal particles, mount the mounting board in the ceiling.
stickers on the drill holes, use drilling tool drill 4
Φ
10holes, insert
handle
Figuer1-11
Figuer1-10
adjusting handle
adjust tilt inner hexagon screws
adjust screws (2 sides)
adjust screws (horizontal, left,right)
(2 sides)
Step4
-
3: Thread the cable of projector in the inner tube
insert the inner tube into the outer tube that mount it in
Refer
fi
gure 1 - 1 0.(Suitable for ceiling hoisting and installation)
guide chute and lock 4 adjusting screws on left&right
installing projector) hang it on the axial screws among the
the ceiling, lift the mounting feet with 2 hands (
fi
nish
use allen key looses bolts on 2 sides, rotate the part of mounting feet and tighten
then adjust the height and tighten the screw, projector tilt angle adjustment:
1-2 bolts in case angle tilt, tighten other bolts after con
fi
rming angle. Refer
fi
gure 1-11
Step4
-
4: Adjust projector:Height adjustment:loose screw of adjusting handle