background image

25

EN

Summary of Contents for Maxem 5

Page 1: ...English Installation manual Maxem 5...

Page 2: ...This can lead to over current on the grid connection damage to installations and charging stations electric shocks or fire Cohere is not responsible for the installation of Maxem and for any damage ar...

Page 3: ...Maxem is a registered trademark of Cohere Energy Solutions B V S M A R T C H A R G I N G C O N T R O L L E R C H A R G E S M A R T E R 2018 COHERE ENERGY SOLUTIONS B V Product symbols statements Insta...

Page 4: ...ting current transformers on the grid connection 36 Option 2 2 Connecting current transformers on the solar panels 36 03 Connecting MID kWh meters 38 04 Connecting charging station Option 4 1 Connecti...

Page 5: ...of your heat pump In the near future Maxem manages the power of your heat pump or e boiler in order to store solar energy in hot water Heat pump or e boiler Maxem optimizes power consumption on the ma...

Page 6: ...g plate 6x split core current transformer RS485 cable Network cable Power cable 4x Screws 3x20 1x Phoenix connector Product specifications 2x Tie wrap SET OK 1 2 3 MID kWh meter Definitions LED indica...

Page 7: ...pecifications Dimensions 184 mm L x 167 mm W x 55 mm H Weight 700g Working temperature 10 C to 35 C Storage temperature 0 C to 60 C Maximal humidity 80 Protection class II double insulated Seal IP20 W...

Page 8: ...at do I need for the installation Wired Internet access With Maxem compatible charging stations Compatibility may change over time See the website www maxem io for the current overview of compatible c...

Page 9: ...r supply Charging station capacity Maximal fusing charging station 3 phase 25A 3 phase 32A 3 phase 25A 3 phase 25A 3 phase 16A 3 phase 16A 3 phase 35A 3 phase 32A 3 phase 32A 1 phase 25A 1 phase 32A 1...

Page 10: ...en vooraf 01 Mounting of Maxem Mount Maxem on a clean moisture free wall Use the supplied mounting plate and screws for this Take into account sufficient space around the Maxem Wiring at the bottom 70...

Page 11: ...t C B 230V connection REVISION TITLE A4 DWG NO SCALE 1 2 SHEET 1 OF 2 WEIGHT A A B B C C D D E E F F 4 4 3 3 2 2 1 DATE SIGNATURE DO NOT SCALE DRAWING MATERIAL NAME 1 DRAWN LINEAR CHK D APPV D MFG Q A...

Page 12: ...urrent transformer around the L1 wire of the circuit breaker to the solar inverter see fig 2 No other loads may be connected to this circuit breaker Turn off the main power supply terminal of the fuse...

Page 13: ...3 2 L1 L2 L3 Grid Solar Home Grid Solar Home E E F F 4 3 2 1 L1 L2 L3 1 Main circuit breaker main switch Grid connection meter Circuit breakers fuse box 3 Circuit breaker solar inverter on sub panel 2...

Page 14: ...on in the menu SET OK 1 2 3 Addressing multiple elements Number of devices Device type Standard addressing kWh meter Node device Address Grid connection 100 Solar 001 Charging station 002 Heat pump 00...

Page 15: ...the address of the kWh meter to corresponding node SET OK 1 2 3 Connection RS485 cable on kWh meter A B D E RS1 port for MID kWh meter D E F 4 3 2 Connection RS485 cable on Phoenix connector C B A Con...

Page 16: ...side connect the supplied green Phoenix connector to the data cable 2 wires need to be connected Connect wire 1 orange white to port 2 Connect wire 2 orange to port 1 Connect the green Phoenix connect...

Page 17: ...ready to charge Correct LED indication See installation manual Tesla Wall Connector for more information Top LED is green center LED blinks red 4x the Wall Connector is set to Slave but is not commun...

Page 18: ...n both sides Connect the UTP cable to the Ethernet port of the charging station and the ETH port of Maxem It is advisable to test the network cable with the help of a cable tester DSW1 Power paragraph...

Page 19: ...of the DIP switches on OFF E F Example 10A DSW 1 6 OFF DSW 1 7 OFF DSW 1 8 OFF 10A 13A 16A Maximal current strength 20A 25A 32A Settings on DSW1 1 of 3 phase See installation manual KEBA P20 P30 for m...

Page 20: ...a circuit breaker and or earth leakage circuit breaker for each charging station at the maximal power available See p 33 Follow the installation instructions of the charging station These instruction...

Page 21: ...started up Connect the 230V power supply to Maxem A B Maxem has to be configured online by the installer in order to be commissioned For this go to the mobile website https install maxem io D In case...

Page 22: ...all the Maxem support telephone number Light is red Something is wrong with the local network and Maxem is unable to connect to the cloud Check the requirements for the Internet connection on page 32...

Page 23: ...23 EN...

Page 24: ...24...

Page 25: ...25 EN...

Page 26: ...y Directive Hereby declare that the product Maxem Energy Manager 4 0 is in conformity with the applicable requirements of the following documents Emissions EN 61326 1 2013 EN 61000 3 2 2006 A1 2009 A2...

Page 27: ...27 DE...

Page 28: ...Maxem is a product of Cohere Energy Solutions Willem de Zwijgerlaan 350 1055 RD Amsterdam The Netherlands info maxem io www maxem io...