03 - Connecting MID kWh-meter
Maxem can measure different elements through an external MID certified kWh-meter. In
order for the auto configuration to function properly, the kWh-meter must be set to the right
address. This is done as follows:
Node/device
Address
Solar #1
001
Solar #2
011
Charging station #1 002
Charging station #2 012
Heat pump #1
004
Heat pump #2
014
Location of the ‘addressing’ function in the menu
SET
OK
1 2 3
Addressing multiple elements
Number of devices
Device type
Standard addressing kWh-meter
Node/device
Address
Grid connection
100
Solar
001
Charging station
002
Heat pump
004
Addressing
Configuring an MID kWh-meter
Hold the button for 2 sec. to enter the menu, or to go up in the menu.
Scroll down through menu or adjust setting value.
Press to get into a menu item or accept an adjustment.
Press to adjust a setting.
Navigation through the menu of the ABB B23/B24 kWh-meter
If you see this icon in the display of the kWh-meter, there is an active
data connection with Maxem.