27
STEP 3
| PREMIUM KIT ASSEMBLY INSTRUCTIONS & NOTES
PART 6: PREMIUM KIT ASSEMBLY
1. Remove and discard hole caps using caution
not to scratch the paint.
2. Attach plug to Rep Counter.
3. Assemble Towel Hook (3P) and Rep Counter
(2P) using the M8 X 35L SHC bolts provided.
4. Torque bolts to 17 N-m/147 in-lbs.
Rep Counter wires must be
routed through the center of
the Towel Hook
Rep Counter
ASSEMBLY
Summary of Contents for VS-S53
Page 1: ...OWNERS MANUAL Versa Single Station Strength VS S53 Abdominal ...
Page 7: ...7 MARKINGS WARNING LABEL LOCATIONS ...
Page 29: ......
Page 30: ......
Page 31: ......