56
CHAPTER 9: PART REPLACEMENT GUIDE
9.16 ECB REPLACEMENT - CONTINUED
7) Loosen the remaining 2 screws to remove the 2 regular nuts (Figure E). Then remove the ECB.
8) There should be 4 screws & ferrules remaining to mount the new ECB (Figure F).
9) Install a new ECB onto the 4 screws / ferrules.
10) Before tightening the nuts, use a piece of fabric or other material that is approximately 0.5mm thick to adjust the gap between the flywheel
and the ECB (Figure G).
NOTE:
Once the ECB is in the correct position, torque the 4 ECB screws to 10 N-m. There should normally be a small
amount of friction between the flywheel and the ECB.
11) Reverse Steps 1-8 to hook up the ECB and re-assemble the unit.
12) Test the Climb Mill for function as outlined in Section 9.20.
FIGURE E
FIGURE F
FIGURE G
Summary of Contents for C5X-01
Page 1: ...C 5 X 0 1 C L I M B M I L L S E R V I C E M A N U A L ...
Page 4: ...1 1 1 SERIAL NUMBER LOCATION CHAPTER 1 SERIAL NUMBER LOCATION SERIAL NUMBER LOCATION ...
Page 17: ...14 8 1 ELECTRICAL DIAGRAMS CHAPTER 8 TROUBLESHOOTING ...
Page 18: ...15 8 1 ELECTRICAL DIAGRAMS CONTINUED CHAPTER 8 TROUBLESHOOTING ...
Page 20: ...17 8 1 ELECTRICAL DIAGRAMS CONTINUED CHAPTER 8 TROUBLESHOOTING P27 HAND PULSE WIRES ...
Page 23: ...20 8 2 LCB ERROR INDICATORS CHAPTER 8 TROUBLESHOOTING ...
Page 72: ...69 NOTES ...