NEVER LEAVE HEATER UNATTENDED WHILE BURNING OR
WHILE CONNECTED TO A POWER SOURCE
© 2014, Pinnacle Products International, Inc.
Dual Fusion Forced Air Heater User’s Manual
2SHUDWLRQ
6WDUHDWHU,JQLWLRQ
1. Fill the tank with kerosene or other approved
fuel until needle on fuel gauge points to “F”.
2. Replace fuel cap and tighten firmly.
Connect the heater to a three prong
(grounded) power source. You must use a
three prong (grounded) extension cord that
is at least 6 feet long and is a minimum of 14
AWG rating.
4. Press the power button to power on the
heater.
5. Select BTU output setting using BTU HI / LO
buttons.
6. Select desired temperature using temperature
HI / LO buttons.
7. The heater will ignite once the temperature
setting is higher than the ambient
temperature in the space.
127(,ILIWKHKHDWHUVWLOOGRHVQRWLJQLWH
UHIHUWR³7URXEOHVKRRWLQJ*XLGH´RQSDJH
6WRSSLQJ5HVHDWHU
-
To stop the heater, move the power switch to
the “Off” position and unplug the power cord.
-
To restart the heater; wait 10 seconds and
follow ignition steps.
Control Panel:
7
TIP: If the heater does not ignite; press
power button to power off the heater,
check steps 1-3 above and press power
button to power ON the heater.
TIP: If the heater does not ignite, the
thermostat may be set too low. Increase
the temperature to a higher setting until the
heater ignites.
°F
°F
Figure 4