background image

 

10 

 

 

      

 

 
 
 

                        Figure 6.  Electrical Connections 
 

4.  For the inlet solenoid to open, two conditions must be met:  The 

power box switch must be in the ON position, and the float 
switch must be in the vertical (tank not filled) position.  If either 
of these conditions is not met, the inlet solenoid will remain 
closed. 

5.  The normal operating condition is for the power box switch to 

be in the ON position.  In this condition, the solenoid will open 
and allow the PURO PRO to treat inlet water only when the 
storage tank is not full (the float switch is in the vertical 
position).  Whenever the storage tank is full (the float switch is 
in the horizontal floating position), the solenoid will be closed. 

 
PURO PRO Power Switch Operation:

 

 

1.  The power switch has an ON and OFF switch position to 

indicate whether 120 VAC power is being applied to the PURO 
PRO system.   

2.  In the OFF position, no power is being applied to the N/C 

solenoid, and the system will not operate.  In the ON position, 
power is being applied to the PURO PRO system.  However, 
the N/C solenoid will only open, and the PURO PRO system 
will only produce treated water when the float switch is in the 
vertical (Tank-not-full) position. 

 

Float Switch 

Connection 

120V Power Cord 

Float Switch 

Connection 

Summary of Contents for PURO PRO 1800 SC Series

Page 1: ...OPERATION MANUAL PURO PRO 1800 SC Series Modular Reverse Osmosis System MASTER Water Conditioning Corp www masterwater com September 2012 Version...

Page 2: ...nections 9 10 PURO PRO Power Switch Operation 10 11 PURO PRO Float Switch Operation 11 12 Filling the PURO PRO with Water and Start Up 13 PURO PRO Operation and Maintenance 13 14 Production Data Recor...

Page 3: ...d Solids TDS from water The system consists in six 6 high performance reverse osmosis membranes The system is designed to operate with a pressurized 40 to 90 psi feed and a vented storage tank for col...

Page 4: ...be correct Avoid using outlets that are switch controlled 2 Maximum amperage required is 5 amps 3 Make sure the electrical service provides power 24 hours per day We recommend installing a surge prot...

Page 5: ...3 Figure 1 Typical PURO PRO Installation...

Page 6: ...eservative 5 Ensure that the O Ring s on each housing and membrane has Silicone only Lubricant Do not use petroleum lubricants 6 Install two of the membranes in the top row 7 To install the membranes...

Page 7: ...rane Placing Membrane In Manifold Inserting Membrane Housing Into Manifold 8 Repeat with the second membrane in the middle row 9 Install the remaining membranes using the procedure from steps 7 and 8...

Page 8: ...6 Figure 2 Manifold Figure 3 Housings Pre Filter Manifold Post Filter Manifold 4 Membrane Manifolds Housing O Ring...

Page 9: ...O Positioning 1 Wall mount the PURO PRO There are holes drilled into the plastic housing to be used for wall mounting If using the PURO PRO on the ground make sure to place a support under the bottom...

Page 10: ...nnections Figure 5 1 Pipe Puro Pro into the service lines the inlet is NPT and the outlet is OD tube compression We recommend using an inlet outlet and bypass valve in installation piping for future s...

Page 11: ...when in the horizontal floating position See Figure 1 2 Connect the float switch to the power box with the electrical connector provided See Figure 6 3 The inlet solenoid is already connected to the...

Page 12: ...float switch is in the vertical position Whenever the storage tank is full the float switch is in the horizontal floating position the solenoid will be closed PURO PRO Power Switch Operation 1 The pow...

Page 13: ...is closed power is passed and the solenoid valve is opened allowing the Modular Pro to produce treated water 2 This function can be tested by holding the float adjusting the orientation and listening...

Page 14: ...12 Low Water Switch On High Water Switch Off WEIGHT METHOD Low Water Switch On High Water Switch Off ANCHOR POINT METHOD WEIGHT DEVICE...

Page 15: ...sure that the water level is as required Adjust the float rotation point as necessary PURO PRO Operation and Maintenance 1 To ensure proper maintenance it is recommended that a production data sheet b...

Page 16: ...14 6 If the module frame structure becomes loose tighten the FRP Bolts located at the frame corners...

Page 17: ...duct Quality Action Taken Product measurement criteria is selected based upon the configuration of the system For example an appropriate criteria may be gallons per hour or inches of tank height per h...

Page 18: ...have become severely fouled Replace and re start Symptom PURO PRO has greatly reduced production Possible Cause Solution Water pressure is decreased below 60 psi Restore water pressure Drain control...

Page 19: ...oid has failed Replace inlet solenoid Symptom Storage Tank Overflows Possible Cause Solution Float Switch has failed Replace float switch Inlet Solenoid has failed Replace the inlet solenoid PURO PRO...

Page 20: ...freezing or hot water All replacement filters and membranes must be Master Water Conditioning filters and membranes or the warranty is void If the unit is altered by anyone other than Master Water Co...

Reviews: