- 19 -
-
Centrally locate the ZC Base sub-assembly onto metal frame channels with the front flange
flush with the timber base frame's front face.
-
Use holes on the base sub-assy channel as a reference and drill pilot holes into the short
base channel.
-
Secure the ZC base sub-assembly to metal frame in the base using 4x 12G x 25
-
Self-tap screws
-
Depending upon location, use suitable equipment to lift the heavy fire on to the frame.
-
Remove internal parts to reduce weight.
Summary of Contents for MATAKANA 1200
Page 10: ... 9 ...
Page 11: ... 10 ...
Page 13: ... 12 ...
Page 15: ... 14 ...
Page 16: ... 15 ...
Page 18: ... 17 ...
Page 32: ... 31 ...
Page 34: ... 33 ...