OPERATOR'S MANUAL
ENGLISH
Cod. EKE0002OM
67
Figure 8
Before centering pistons vertically, rotate the flywheel 1 cycle to check its horizontal
centering. There are two fixed rails at the bottom of bale machine. The top two L twist rail can
be adjusted up and down. Move the piston all the way back and start vertical centering of the
piston. Loosen 4 each bolts (10) that secure the two L twist upper rail plates on the baling
room and move the rails vertically. Rotate the flywheel again to move the piston all the way
forward. Adjust the rails vertically and tighten. Ensure that the distance between top twist rails
and vertical wheel bearing is 0,38-0,76 mm. (Figure 9)
Figure 9
Summary of Contents for PITAGORA INLINE
Page 2: ......
Page 12: ...ENGLISH OPERATOR S MANUAL 12 Cod EKE0002OM PITAGORA INLINE Machine Dimensions Fig1 Fig2 ...
Page 22: ...ENGLISH OPERATOR S MANUAL 22 Cod EKE0002OM ...
Page 25: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 25 11 12 13 14 15 ...
Page 26: ...ENGLISH OPERATOR S MANUAL 26 Cod EKE0002OM 16 17 18 19 20 21 22 23 ...
Page 65: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 65 Figure 4 Figure 5 ...
Page 69: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 69 Figure 1 ...
Page 70: ...ENGLISH OPERATOR S MANUAL 70 Cod EKE0002OM Figure 2 Figure 3 ...
Page 73: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 73 Fiigure 3 ...
Page 75: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 75 Figure 2 ...
Page 76: ...ENGLISH OPERATOR S MANUAL 76 Cod EKE0002OM Figure 3 ...
Page 79: ...OPERATOR S MANUAL ENGLISH Cod EKE0002OM 79 Figure 2 ...