
Assembling: Mounting the top caps
Put the fork in the vice in vertical position, fixing it by the dropouts.
Using the 21mm socket spanner, tighten cap (
1
) to the recommended tightening torque (
10 Nm ± 1
).
Restore the correct preload value, if necessary (see settings).
© Marzocchi Suspension
2006
-
MZ II