Marvel ML-150-12 Installation & Operation Manual Download Page 21

 

 

19 

Storage: system Message 

Parameter :Do not use 

Other1:Do not use 

Other2: Select inverter communication protocol and Bluetooth name. 

Upgrade

Upgrade program  

Connect the BMS  host PC computer, enter the “other 2” menu, select the corresponding inverter 
communication protocol, and then operate step by step according to the mode shown in the figure 
below. 

 

 

 

NOTE:

 Both Master and RS485 ports can connect with PC and other parallel batteries. The Master/RS485 

communicate to PC need to buy  USB to 485 tool. 
 

 Master/RS485 to PC or Parallel                              Master/RS485 Port Define   

 

     

                                       

RS485-8P8C-RJ45 

RS485-8P8C-RJ45 

RJ45 pin 

definition  

RJ45 pin 

definition  

1

RS485-B 

9

16 

RS485-B 

2

RS485-A 

10

15 

RS485-A 

3

GND 

11

14 

GND 

4

NC 

12

13 

NC 

STEP1. Click read  

 

STEP2. Set 
corresponding 
communication 
protocol 

STEP3. Click write 

Summary of Contents for ML-150-12

Page 1: ...xplain system configuration concepts and installation instructions Please note the image shown is for illustration purposes only Warning Read this entire document before installing or using this produ...

Page 2: ...n 10 3 1Install Location 10 3 2Tools Safety Gears Required 10 3 2 1Tools 10 3 2 2Safety Gears For Personal Protection 10 3 3DC Cable Prepared 11 3 3 1Choose DC Cable 11 3 3 2Fabrication of DC Cable 11...

Page 3: ...t of reach of children Read the instruction manual before starting installation and operation Heavy weight may cause serious injury to the back Do not dispose of the product with household wastes Recy...

Page 4: ...he product where it should be minimal dust and dirt in the area Do not disconnect disassemble or repair by unquali ed personnel Service must be made by quali ed personnel only Do not damage the unit i...

Page 5: ...eries if it is safe to do so power off the switch If the battery pack is not on fire yet extinguish the fire before the battery pack catches fire If the battery pack is on fire do not try to extinguis...

Page 6: ...ltage and temperature it also makes a good communication between battery system and the host equipment Monitoring unit will automatically measure the battery charge and discharge current charge and di...

Page 7: ...5 2 3 Appernce and Mechanical Drawing ML 150 12 ML 200 12 ML 200 24...

Page 8: ...6 ML100 51 2 ML 200 48...

Page 9: ...120A 100A 120A 15 Max Discharge Current RT 120A 5S 120A 5S 130A 8S 130A 8S 130A 8S 16 Over Discharge Protection Release Charging or Cut off loads and Restart 17 Discharge Temp Range 10 55 RT 25 Cycle...

Page 10: ...w Main Interface Maximum and minimum cell voltage maximum and minimum cell temperature Press the menu key of main interface to enter the above interface Select the item and press the menu key to enter...

Page 11: ...oading and unloading process should be light moving gently to prevent throwing rolling pressing Direct rain and mechanical impact of rain and snow should be avoided in transportation 2 5 2 Storage Pro...

Page 12: ...ldren and animals CAUTION If the ambient temperature is outside of the operating range the battery pack may stop operating to protect the internal components The optimal temperature range for the batt...

Page 13: ...or more information WARNING The torque rating range for DC terminal is 9NM 12NM and the suggested torque rating is 9NM Over torqueing may cause the bolt to break 3 3 2 Fabrication of DC Cable You can...

Page 14: ...The pressure shall be maintained for 2 seconds during crimping Step4 Install the riveted terminal into the plug body Step5 Install the upper cover of the plug into the plug body Step6 Install the she...

Page 15: ...S AND OR STRAPS TO HANDLE THE WEIGHT OF THE BATTERY WELL VENTILATED HEAVY DUTY BATTERY CABINET IS RECOMMENDED 3 4 1 Battery Installation Wall Mounted Battery Installation Step1 Use an M8 drill bit wit...

Page 16: ...tion Step1 Use M8 drill bit with drilling depth of about 40mm and drill the corresponding hole position according to the following battery installation dimensions Step2 Move the battery to the corresp...

Page 17: ...ls note the distance of batteries Vertical Battery Parallel Installation Tips Hole drilling installation shall be carried out according to the installation method of single battery in Chapter 3 4 1 Pl...

Page 18: ...r part is connected normally Step 2 Check whether the communication harness is connected normally as required Step 3 Setting a corresponding communication protocol between and battery and inverter Ple...

Page 19: ...rotocol V1 13 1 PYLON CAN Bus protocol PYLON low voltage V1 2 20180408 1 PYLON PYLON low voltage protocol RS485 V3 5 20200227 2 Growat Growatt Bms CAN BUS protocol low voltage v1 08 2 Growat SPF RS485...

Page 20: ...ol click Enter to automatically jump to the third number At the time the third number is in flashing state and enters the CAN protocol selection state The selection range is 15 bits 0 D Select corresp...

Page 21: ...step according to the mode shown in the figure below NOTE Both Master and RS485 ports can connect with PC and other parallel batteries The Master RS485 communicate to PC need to buy USB to 485 tool Ma...

Page 22: ...ter software Master port One RS485 interface is used for external inverter communication and this port can also be used as the CAN communication port CAN RS485 port 4 4 1 Master RS485 CAN Ports Introd...

Page 23: ...x03 3 ON ON OFF OFF 4 0x04 4 OFF OFF ON OFF 5 0x05 5 ON OFF ON OFF 6 0x06 6 OFF ON ON OFF 7 0x07 7 ON ON ON OFF 8 0x08 8 OFF OFF OFF ON 9 0x09 9 ON OFF OFF ON 10 0x0A 10 OFF ON OFF ON 11 0x0B 11 ON ON...

Page 24: ...y non technician System design and installation are not in compliance with standards and regulations Failure to comply with the local safety regulations Transport damage including painting scratch cau...

Reviews: