Marvair Scholar III™ VAISA I&S Manual 03/2019 Rev. 8
4
SECTION 15700
HEATING, VENTILATING AND AIR CONDITIONING EQUIPMENT
1.01 TOOLS/FIELD FURNISHED SUPPLIES
WARNING
TO AVOID PERSONAL INJURY, ADEQUATE PROTECTIVE CLOTHING MUST BE WORN
AND PRECAUTIONS IN HANDLING AND INSTALLING THIS EQUIPMENT MUST BE
PRACTICED AT ALL TIMES.
• Power Drill/Driver & Extension
• T25 TORX Bits
• 5/16 hex bit
• Needle Noise Pliers
• Wire Stripper/Cutter
• Spirit Level
• Tape Measure
• Screwdriver with Slotted Bit
• Caulk Gun
• Sealant Caulk (tube)
• Wire Nuts for Power and Control Wiring Gauges
• Supplies to Install PVC Condensate Drain
• Floor Fasteners for Cabinet (4 required for 1/2” pass through holes) - Appropriate
Drivers for Floor Fasteners
• Supplies to Install Wet Heat Coil (Steam or Hot Water) (if appropriate)
• 25 Ft. of Polyurethane Foam Strips, 1” Wide x 1/2” Thick, Adhesive Backing, for
Scholar III/Wall Interface.
1.02 INSPECTION/UNPACKING/HANDLING
A. The Scholar III™ heat pumps and air conditioners are shipped to the job site on 4x4
wood base framing, and enclosed in shrink wrap.
Freeblow and ducted plenums are shipped on wooden skids and enclosed in shrink
wrap.
Outdoor louvers/collar assemblies, louvers and collars are shipped in corrugated
containers.
Base stands are shipped on a wooden skid and are enclosed in shrink wrap.
Trim pieces are enclosed in corrugated carton and strapped to a wooden skid.
B.
Immediately upon delivery to the jobsite, each Scholar III™ heat pump or air
conditioner and the appropriate additional accessories should be inspected
for visible and concealed damage. All damage must be reported to the freight
carrier within 15 days, on the freight carrier’s form.
The Scholar III™ heat pump or air conditioner and additional accessories should
be stored inside and not exposed to outdoor weather conditions. Do not remove
equipment from packing until it is ready to be installed.