Product Installation
NOTE:
This product must be installed by a licensed electrician.
NOTE:
For best performance install at a height between 2 and 2.5 metres.
1.
Ensure the Mains Supply is switched ‘OFF’.
2.
wired to its own wall switch.
3.
Remove the mounting plate ‘A’ from light body ‘B’ by unscrewing the front screw ‘C’ and pressing the
wall mount plate fixing knob ‘H’.
4.
Drill two holes in the wall using the mounting holes ‘D’ on the mounting plate ‘A’ as a template.
Note: exercise caution to avoid drilling into existing electrical wiring.
5.
Feed mains supply cable through the wall and weatherproof holes as appropriate. and pass the
mains supply cable through the grommet 'F'.
6.
7.
8.
9.
Apply silicone if required around the base plate and grommet ‘F’ to maintain IP rating.
10. Reconnect the mains supply.
11. Turn on the bunker light.
BEFORE COMMENCING INSTALLATION
For the best performance we suggest you take into account the following:
light into its own circuit with its own switch.
The recommended mounting height is 2 to 2.5 metres.
Do not install on surfaces which can move or vibrate.
Installation Instructions
E
www.martecaustralia.com.au | 02 8778 7500 | [email protected]
Page
bunker
bunker
E
Connect the Live (L), Neutral (N) cording to the markings on the terminal block ‘G’.
ac
D
G
F
A
C
B
the screw
and
and the wall mount plate fixing knob 'H',
H