6. Use four (4) threaded rods for overhead installation or
four (4) threaded bolts for wall installation. All hardware
is field provided by others. (FIG. 3)
FIG. 3
7. If applicable, optional Adjustable Mounting Brackets,
Side Extension Plates and Extended Wall Mounted
Brackets are also available for installations over a
Vertical Lift or Drum Roll-up type door. (Reference
Accessory Installation Supplement
)
8. If applicable, for tandem installation or products
mounted side by side, allow no more than 6” between
the two products. For overhead installation using
threaded rods, the products may require a beam, by
others, to span the full distance of the mounting length.
(Reference
Accessory Installation Supplement
)
9. All wires must be connected internal of the unit and
some knockouts are provided. However, it may be
necessary to create your own knockout, as required.
10. The unit must be wired per NEC and local codes.
Electrical Field Wiring
The unit and any optional accessories must be wired with
the proper voltage to the junction box per the wiring
diagram. (FIG. 4, unheated products only)
FIG. 4
START-UP
This product has been assembled and tested at the
factory prior to shipping. The following procedures should
be performed to assure its performance. Before
continuing with the start-up, it is important to recognize
the safety controls furnished with the unit.
WARNING
The following items must all be completed by a qualified
installer and checked off when completed
A. Re-check that the product has been installed properly
and is level and secure.
B. Check all terminal screws are tight and field wiring is
connected in accordance to National Electrical Code
and wired per the enclosed wiring diagram. For
electric heated models, ensure that the coils are
secured and not touching each other on any metal
surface.
C. Verify proper voltage prior to powering the product.
(See product label for reference).
D. Check all field wired components “if supplied” are
wired correctly.
E. Check that the inlet air supply and the discharge air
supply are free of obstructions.
F. Check that all air filter(s) and/or air intake grille(s) are
in place and installed properly, as originally shipped.
G. Verify voltage to the product once more and turn
power on.
H. Regardless of whether the product is mounted on the
inside or outside of the door opening, set the air
directional vanes in the discharge nozzle slightly
outward to approximately 10-15° towards the outside,
or the wind load. (FIG. 5).
NOTE
For accessory installation, reference Accessory
Installation Supplement.
For heated products, reference Heated Products
Supplement.
WARNING
Prevent hazard of electrical shock. More than one
disconnect switch may be required to de-energize this
product.