background image

 

 

6.  Use four (4) threaded rods for overhead installation or 

four (4) threaded bolts for wall installation. All hardware 

is field provided by others. (FIG. 3) 

 

FIG. 3 

7.  If applicable, optional Adjustable Mounting Brackets, 

Side Extension Plates and Extended Wall Mounted 

Brackets are also available for installations over a 

Vertical Lift or Drum Roll-up type door. (Reference 

Accessory Installation Supplement

8.  If applicable, for tandem installation or products 

mounted side by side, allow no more than 6” between 

the two products. For overhead installation using 

threaded rods, the products may require a beam, by 

others, to span the full distance of the mounting length. 

(Reference 

Accessory Installation Supplement

9.  All wires must be connected internal of the unit and 

some knockouts are provided. However, it may be 

necessary to create your own knockout, as required. 

10. The unit must be wired per NEC and local codes. 

 

Electrical Field Wiring  

 

The unit and any optional accessories must be wired with 

the proper voltage to the junction box per the wiring 

diagram. (FIG. 4, unheated products only)  

 

 

FIG. 4 

 

START-UP 

 

This product has been assembled and tested at the 

factory prior to shipping. The following procedures should 

be performed to assure its performance. Before 

continuing with the start-up, it is important to recognize 

the safety controls furnished with the unit.

 

 

    WARNING 

The following items must all be completed by a qualified 

installer and checked off when completed 

 

A.  Re-check that the product has been installed properly 

and is level and secure. 

B.  Check all terminal screws are tight and field wiring is 

connected in accordance to National Electrical Code 

and wired per the enclosed wiring diagram. For 

electric heated models, ensure that the coils are 

secured and not touching each other on any metal 

surface. 

C.  Verify proper voltage prior to powering the product. 

(See product label for reference). 

D.  Check all field  wired components “if supplied” are 

wired correctly. 

E.  Check that the inlet air supply and the discharge air 

supply are free of obstructions. 

F.  Check that all air filter(s) and/or air intake grille(s) are 

in place and installed properly, as originally shipped. 

G.  Verify voltage to the product once more and turn 

power on. 

H.  Regardless of whether the product is mounted on the 

inside or outside of the door opening, set the air 

directional vanes in the discharge nozzle slightly 

outward to approximately 10-15° towards the outside, 

or the wind load. (FIG. 5). 

 

NOTE 

 

For accessory installation, reference Accessory 

Installation Supplement. 

 

For heated products, reference Heated Products 

Supplement.

 

 

    WARNING 

Prevent hazard of electrical shock.  More than one 

disconnect switch may be required to de-energize this 

product. 

   

Summary of Contents for LPN2 Series

Page 1: ...stamped air intake screen s The LPV2 models can be configured with an aluminum mesh filter s as an option The LPN2 models 25 and all LPN F models come standard with an aluminum mesh air intake filter...

Page 2: ...l other accessories from interior of unit prior to operating Severe unit damage will occur if these items are not removed prior to operation 2 Lay unit on its top with directional vanes pointing up an...

Page 3: ...uing with the start up it is important to recognize the safety controls furnished with the unit WARNING The following items must all be completed by a qualified installer and checked off when complete...

Page 4: ...nimize condensation and freezing for freezer applications We recommend the air curtain unit to not replace doors but work in conjunction with door opening sequence cycle Contact factory for details CA...

Page 5: ...on on intake or discharge Remove obstruction or move air curtain Power leads out of polarity Switch power leads to correct polarity 3 phase models only Blower motor rotating below normal speed Apply p...

Page 6: ...ma 1 1 115 1 1 6 2 4 03 015 7124 1096 Genteq Nema 1 1 208 230 1 6 5 9 2 03 015 Nidec Nema 1 1 208 230 1 4 3 6 5 03 014 K55BWJZB 2362 US Nema 1 1 115 1 1 2 1 03 015 US Nema 1 1 208 230 1 3 2 6 3 Black...

Page 7: ...omer may be responsible for transportation charges associated with replacement of failed part Mars does not warrant uninterrupted or error free operation of Mars product Under no circumstance is Mars...

Reviews: