6
INSTALLATION
Tank Preparation
1. Locate unit near a 110–120 volt grounded
outlet with a 15 amp dedicated circuit.
2. Make sure Vented Panel is not obstructed.
These panels allow cooling air to reach
compressor. They also provide access to
filters, thermostat, on/off switch, drains and
other components.
3. Unpack all accessories, supplies and Upper
False Bottom from tank.
WARNING:
Do not attempt to operate unit on
extension cord or non-grounded circuit.
Do not handle or connect plug with wet hands.
The following simple steps are required to get your system up and
operational. Consult exploded views for any necessary clarification.