![MarineKinetix MK4+ User Manual Download Page 7](http://html1.mh-extra.com/html/marinekinetix/mk4/mk4_user-manual_1727370007.webp)
MK4+ Hybrid Charge Controller User Manual
6
protection, over-load protection, wind generator current limiting, automatic
braking, PV reverse polarity connection protection, etc.
3. Installation
(
Connection Diagram of Controller Terminals
)
The user should connect and operate the system according to following
procedures only after the wind generator, solar panels, and external circuit
wiring is completed.
Step 1
Check the package and then check the controller for any damage after
unpacking. Do not install a damaged controller, and contact
MarineKinetix or your dealer immediately.
Step 2
Connect any external DC loads (e.g. lights) that you wish the controller
to control to the
“DC OUTPUT” terminals: The first load should be
connected to "+" and "-1" of the
“DC OUTPUT” terminals, and the
second load should be connected to "+" and "-2" of the
“DC
OUTPUT” terminals. Max load is 10A each.