background image

8

Mareli Systems

It is important that faulty parts to be replaced immediately !!!

Always keep in stock additional photo sensor and heater for replacement.
At the end of the period, upon decommissioning the burner, clean the fuel surfaces from any deposits. Clean 

the screw conveyor and the hopper from residual sawdust. Cut off the burner power supply.

Additional information:

1.  Cables of the thermal sensors can be extended up to 10 m. 

2.  Installation of the thermal sensors should be done with immersion sleeves or applied under insulation 

pipes.

3.  Sensors are part of the controller. Do not replace them with others. 

4.  Indoor thermostats with relay output must be used.

5.  Bedroom thermostat cable section - 2x0.75mm2

6.  The required chimney draught is at least 20 Pa. Install additional chimney fan (controlled by the control 

unit of the burner) if the values are lower.

7.  When wiring pumps or a chimney fan, the wiring inputs in the housing of the burner must be used. If 

there is a shortage of inputs, additional inputs must be installed.

8.  The burner ignites more easily at low fan speed. Carefully adjust parameter 04. Recommended values 

are 15-18%.

9.  The time for pellet loading before ignition - parameter 02 (first dose), must be sufficient so that the 

fallen pellets.

                   Cover the holes in the combustion basin.

10.  The initial ignition of pellets produces large volume of smoke. If there is no additional chimney fan, 

smoke leakage is possible through the seals on the boiler doors. The smoke usually disappears during 

normal operation.

11.  To achieve the desired output of the burner, do the following:

• 

Start the burner and wait it to go to the 5-th degree of power.

• 

Remove the photoelectric cell from the connector and keep light conditions of the photo-

electric cell over 100 units. 

• 

Disconnect the flexible connection from the burner and collect the pellets passed from the 

conveyor into a bag for 10 min.

• 

Weigh the pellets passed and multiply by the factor 0.03.

• 

The calculated value is the power in KW/h.

• 

Example: If the screw conveyor passes 1,300 g pellets for 10 min. 1,300x0.03 = 39 Kw/h - 

heating power.

12.  It is recommended that the time for pellet feeding is half of the time for rest.

13.  Indoor thermostat is connected to a filter for about 3 minutes. This means that the START signal from 

the thermostat shall be read as such 3 min. after it has been reported to the control unit. It is similarly 

for the STOP signal. If there is a signal of overheating from the back combustion sensor, the fan of the 

burner continues to operate for about 5 minutes in order to purge and cool.

14.  If during the winter period the facility will not use, the installation must be drained or filled with 

non-freezing fluid (polypropylene glycol).

Instructions for installer and service technician:

Screw conveyor installation:

Install the screw conveyor at an angle of 45 0 into the pellet hopper.

Fill the hopper and plug the screw conveyor to 230V/ 50Hz. Wait for the screw conveyor pipe to be filled with 

pellets and switch the plug to the burner. In order to ensure the normal free-fall of the pellets from the screw 

conveyor to the burner, the flexible connection must be well tensioned and the difference in levels between the 

screw conveyor outlet and the burner input shall be at least 40 cm.

Parameter adjustment:

The fuel process of the burner depends on several parameters. Fan speed (in percentages), time for feeding 

pellets from the screw conveyor (s), time for the rest of the screw conveyor (s). These parameters are adjusted 

separately for the five degrees of power. The degrees are upstream. It is not recommended that the power of 

the first or second degree is greater than the power of third, fourth, and fifth. For the recommended settings, 

please refer to the manual for programming the controller of the pellet combustion system.

Summary of Contents for SMB 50

Page 1: ...SMB 50 Pellet burner Assembly and exploitation manual Mareli Systems...

Page 2: ...y an adult who is familiar with the operating conditions Introduction of inflammable liquids in room with a working burner is strictly prohibited Children should not be left unattended in the room whe...

Page 3: ...lied to the flexible tube The flexible tube is made of special heat resistant material which in the case of combustion does not emit toxic substances and connects the auger and pellet burner End view...

Page 4: ...urely attach a pellet burner to the door through M8 screws which are screwed where the thread is made on the door itself which holds the burner to the door Explanation It must be checked whether seali...

Page 5: ...or about 3 hours for the chimney to be warmed up and measure the draught Install addition al chimney fan controlled by the control unit of the burner if necessary The heat exchange surface is made of...

Page 6: ...omical and efficient operation of the boiler burner system in the installation Why is regular maintenance important Heating systems should be maintained on a regular basis for the following reasons To...

Page 7: ...aintenance The use of special protec tive equipment safety goggles tightly fitted is recommended CAUTION Periodic cleaning as well as supervision of the burner will prevent any incidents caused by fau...

Page 8: ...from the burner and collect the pellets passed from the conveyor into a bag for 10 min Weigh the pellets passed and multiply by the factor 0 03 The calculated value is the power in KW h Example If th...

Page 9: ...ner settings to use exhaust gas analyser IMPORTANT Default values of the parameters should not be taken for granted The settings must be adjusted individually according to REQUIRED POWER TILT OF THE S...

Page 10: ...user you may only make repairs which involve just a simple replacement of the grate In case of first commissioning of the boiler condensation of water vapour on the heating surfaces of the heat excha...

Page 11: ...stat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of rev...

Page 12: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Page 13: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Page 14: ...14 Mareli Systems WIRING DIAGRAM...

Page 15: ...15 Mareli Systems...

Page 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Reviews: