background image

4

Mareli Systems

3. Connection (installation) to the boiler:

The pellet burner can be attached to a steel or cast-

iron boiler with power from 10 to 50kW. The min-

imum depth of the combustion chamber should be 

450 mm. Pellet burner without secondary air supply.

• 

Distance between the flame and the cooling 

surface of the boiler 150mm.

• 

The unit is located so that there is enough space 

for cleaning, removing ash from the burner, 

boiler and exhaust pipes.

• 

Putting objects on the unit is forbidden, so 

as not to break the seal. There is a danger of 

breaking and violating the integrity of the 

burner.

• 

The opening for installation of the burner must have a width 128 mm and height of 121 mm. The size of 

the door, to be joined must allow for the incision of the above-described mounting hole (if there is none). 

• 

The burner is installed in the boiler door with the corresponding seal. Secured tightly with screws M8. 

The relationship between the burner and boiler should be well sealed in order not to get gas leaks into the 

room. When installing the equipment is in optimal horizontal position and the inlet hose pellets should 

be straight and clamps must be properly tightened.

Appendix 1

Reconstruction of hot water boiler with automated burner

• 

Cut a hole in the available door (if there is no such planned). The sizes described in the instructions 

should be respected.

• 

Thoroughly clean the interior walls of the boiler from ash residue, soot, etc., which would have led to 

appearance of thermal resistance during operation. After cleaning, the drawer for collection of the ash 

from the combustion chamber must also be taken out.

• 

Then, mount and securely attach a pellet burner to the door through M8 screws (which are screwed, 

where the thread is made on the door itself), which holds the burner to the door.

Explanation

: It must be checked whether sealing ropes of the doors fit snugly to the boiler housing. If any 

gaps are found, the corresponding sealing rope must be replaced and ensure the density of this zone;
• 

Install the fuel supply conveyor, which feeds the automated pellet burner.

CAUTION: Before installation of the valve must be drained circulating water from it!
• 

Install the fuel transport auger that feeds the pellet burner.

The fuel supply conveyor must be installed in such a way so that fuel can be freely extracted from the hopper 

– from its lowest point. In the event that the hopper is made/assembled on site, it is recommended to make 

a manhole for servicing the rowing area of the screw conveyor. The screw conveyor pipe itself also must be 

fastened, so as to ensure against upheaval and possible change of the screw conveyor axis angle against the 

horizontal plane.

Explanation

: The tilt angle (between the screw conveyor axis and the horizontal plane) of the screw conveyor 

has a direct effect on its performance, i.e. the fuel flow which it will provide at a specified operating mode. 

That is why adjustment of the burner settings is likely to be required upon change of this angle, in order to 

insure specific heating power.
• 

Provide the power supply directly through a plug. Before connecting to the power the burner must be 

earthed through a 4 mm2 copper wire with yellow-green insulation.

Power supply is provided through a Shockproof type plug directly in the mains.
CAUTION! The burner control unit should be plugged into an outlet, which must be earthed. There is a risk 

of electric shock in the absence of earthed plug! The manufacturer bears no responsibility!

Summary of Contents for SMB 50

Page 1: ...SMB 50 Pellet burner Assembly and exploitation manual Mareli Systems...

Page 2: ...y an adult who is familiar with the operating conditions Introduction of inflammable liquids in room with a working burner is strictly prohibited Children should not be left unattended in the room whe...

Page 3: ...lied to the flexible tube The flexible tube is made of special heat resistant material which in the case of combustion does not emit toxic substances and connects the auger and pellet burner End view...

Page 4: ...urely attach a pellet burner to the door through M8 screws which are screwed where the thread is made on the door itself which holds the burner to the door Explanation It must be checked whether seali...

Page 5: ...or about 3 hours for the chimney to be warmed up and measure the draught Install addition al chimney fan controlled by the control unit of the burner if necessary The heat exchange surface is made of...

Page 6: ...omical and efficient operation of the boiler burner system in the installation Why is regular maintenance important Heating systems should be maintained on a regular basis for the following reasons To...

Page 7: ...aintenance The use of special protec tive equipment safety goggles tightly fitted is recommended CAUTION Periodic cleaning as well as supervision of the burner will prevent any incidents caused by fau...

Page 8: ...from the burner and collect the pellets passed from the conveyor into a bag for 10 min Weigh the pellets passed and multiply by the factor 0 03 The calculated value is the power in KW h Example If th...

Page 9: ...ner settings to use exhaust gas analyser IMPORTANT Default values of the parameters should not be taken for granted The settings must be adjusted individually according to REQUIRED POWER TILT OF THE S...

Page 10: ...user you may only make repairs which involve just a simple replacement of the grate In case of first commissioning of the boiler condensation of water vapour on the heating surfaces of the heat excha...

Page 11: ...stat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of rev...

Page 12: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Page 13: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Page 14: ...14 Mareli Systems WIRING DIAGRAM...

Page 15: ...15 Mareli Systems...

Page 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Reviews: