Dustmaster
®
28,000 CFM Tier 4 Diesel Dust Collectors
8
DAILY PRE-OPERATION CHECKLIST
Daily Pre-operation Checklist
1. Dust Collector
2. Discharge Collection Drum
3. Air Compressor
4. Air Hose
5. Safety Cable
6. Aftercooler*
7. Duct Hose
* Optional or alternative device.
Ask your Marco Representative
for more details.
Dust Collector
– Position Dust Collector (1) as close to the containment area
as possible. Use short lengths of duct hose, minimizing curves and bends for
improved performance. Perform daily lubrication. (See Lubricate Grease Points.)
Check all fluid levels. Connect a 3/4” I.D. air supply line to Filter Regulator of
Pulser system. Open Air Inlet Door(s) and connect duct hose. (See Connect
Duct Hose). Ensure all unused Air Inlet Doors are closed securely.
Discharge Collection Container
– Empty Discharge Collection Container (2)
before use. Position as shown. Install optional Drum Cover and six inch Duct
Hose.
Air Compressor
– Select an Air Compressor (3) of adequate size to support
all equipment requirements. Before connecting Air Hose (4), sample the air
being produced by the air compressor (3) to ensure it is free of petroleum
contaminants.
Air Hose, and Air Hose Couplings & Gaskets
– Select Air Hoses (4) of
sufficient size to support all subsequent volumetric requirements and with a
sufficient PSI
(pound per square inch)
rating. Inspect all Air Hoses (4), and Air
Hose Couplings & Gaskets (7) for damage or wear. Repair or replace damaged
or worn components.
Safety Cables
– Install a Safety Cable (5) at each Air Hose (4) connection
points.
Aftercooler and Moisture Separator
– Ensure Aftercooler (6) is positioned on
stable ground. Drain after each use.
Duct Hose
– Ensure Duct Hose (7) is serviceble and secured to Dust Collector
and containment area.