When mounting Twin Head Units, ensure a minimum of 100mm between units, not just
between cut-outs, as indicated in Figure 2, below.
The distance between the SP9 Head Unit and the Under Counter unit should be NO MORE
than 400mm.
Max distance between head and boiler refers to the length of the tubing. Since the tubing is
never a straight line, actual distance between head and boiler can be substantially less than
400mm, depending on alignment of units.
Drainage
– Connect drip tray, boiler vent and head vent to a drain via a tundish or some
other method of open connection to drain. Do not connect these three outlets together in a
closed configuration using T-piece or double T-
piece. Always allow these to “breath”.
Figure 2.
Summary of Contents for 1000830
Page 7: ...SP9 ServiceManual docx 06 02 2015 Page 7 of 42 Figure 3 Figure 4...
Page 11: ...SP9 ServiceManual docx 06 02 2015 Page 11 of 42 CONTROLS Figure 6 BREWING...
Page 20: ...SP9 ServiceManual docx 06 02 2015 Page 20 of 42...
Page 21: ...SP9 ServiceManual docx 06 02 2015 Page 21 of 42...
Page 24: ...SP9 ServiceManual docx 06 02 2015 Page 24 of 42 Internal Component Map Figure 13...
Page 31: ...SP9 ServiceManual docx 06 02 2015 Page 31 of 42 15 ELECTRICAL SCHEMATICS...
Page 32: ...SP9 ServiceManual docx 06 02 2015 Page 32 of 42...
Page 33: ...SP9 ServiceManual docx 06 02 2015 Page 33 of 42 16 SPARE PARTS SCHEMATICS...
Page 35: ...SP9 ServiceManual docx 06 02 2015 Page 35 of 42...
Page 36: ...SP9 ServiceManual docx 06 02 2015 Page 36 of 42...
Page 37: ...SP9 ServiceManual docx 06 02 2015 Page 37 of 42 SP9 Head Unit Spare Parts...
Page 39: ...SP9 ServiceManual docx 06 02 2015 Page 39 of 42 18 DIMENSIONED DRAWINGS...
Page 40: ...SP9 ServiceManual docx 06 02 2015 Page 40 of 42...
Page 41: ...SP9 ServiceManual docx 06 02 2015 Page 41 of 42 19 CUT OUT TEMPLATE...
Page 42: ...SP9 ServiceManual docx 06 02 2015 Page 42 of 42 Installation Cut Out Template...